Artemis program
American human lunar spaceflight program
The Artemis program was formally established via Space Policy Directive-1 in 2017 by President Donald Trump.1 The Artemis II crew included the first woman, first Black man, and first Canadian to travel to lunar space.2 On May 16, 2019, NASA Administrator Jim Bridenstine announced that the new program would be named Artemis, after the goddess of the Moon in Greek mythology who is the twin sister of Apollo.1
A summary made of Artemis program's own facts, quoted as read; each sentence cites its source.
Connections
77 linked subjects · 126 links inferred · 28 named together
A link reads subject → relation → subject. Each is stated by a fact (quoted, with its source), taken from Wikidata, or worked out by the knowledge graph's reasoner from the links it was given; inferred links are marked ∴ with the rule behind them.
- stated
- inferred
- named together
- United States Place
- (Artemis program → country → United States) The Artemis program is a U.S.-led program with a plan to build the Artemis Base Camp on the Moon.3
- (Artemis program → city → United States) inferred: implied by “country” (above)
- (Artemis program → location → United States) inferred: implied by “country” (above)
- NASA Organization
- (Artemis program → operator → NASA) In 2017, NASA shifted its focus to a return to the Moon by 2024 with the Artemis program, with a flight to Mars possibly following.5 and 2 more facts
- (Artemis program → organizer → NASA) In April 2026, NASA launched the Artemis II test mission, sending four astronauts around the Moon on a ten-day lunar flyby without entering orbit.2
- (Artemis program → used by → NASA) inferred: implied by “operator” (above)
- (NASA → item operated → Artemis program) inferred: the other reading of “operator” (above)
- Space Shuttle Object
- (Artemis program → derived from → Space Shuttle) Refurbished legacy engines from the Space Shuttle program, some dating back to the early 1980s, are used in Artemis program missions.9
- (Artemis program → influenced by → Space Shuttle) inferred: implied by “derived from” (above)
- (Space Shuttle → source of → Artemis program) inferred: the other reading of “derived from” (above)
- Artemis II Object
- (Artemis II → part of → Artemis program) Artemis II, the first crewed mission of the Artemis program, was planned to launch on April 1, 2026 on a free-return flyby of the Moon.12 and 3 more facts
- (Artemis program → has part(s) → Artemis II) As of 2026, the Artemis program has flown two successful missions, Artemis I and Artemis II.1
- Christina Koch Person
- (Artemis program → crew members → Christina Koch) The Artemis II crew included the first woman, first Black man, and first Canadian to travel to lunar space.2
- (Christina Koch → affiliation → Artemis program) inferred: implied by “member of”
- (Christina Koch → member of → Artemis program) inferred: implied by “member of the crew of”
- (Christina Koch → member of the crew of → Artemis program) inferred: the other reading of “crew members” (above)
- Orion Object
- (Orion → used by → Artemis program) The Orion spacecraft, paired with the European Service Module, is a system originating from the canceled Constellation program and used in the Artemis program.1 and 3 more facts
- (Orion → part of → Artemis program) For missions beyond low Earth orbit, NASA is building the Space Launch System and the Orion spacecraft, part of the Artemis program.12 and 1 more fact
- (Artemis program → has part(s) → Orion) inferred: the other reading of “part of” (above)
- Artemis I Object
- (Artemis program → has part(s) → Artemis I) The United States began the Artemis program with the launch of Artemis I in 2022.4 and 1 more fact
- (Artemis I → part of → Artemis program) The European Service Module for Artemis I made its first flight on November 16, 2022, as the first major milestone in NASA's Artemis program to return humans to the Moon.13
- Space Launch System Object
- (Artemis program → has part(s) → Space Launch System) Space Shuttle–derived hardware, including the Space Launch System core stage, its RS-25 engines and solid rocket boosters, is among the principal elements of the Artemis program.1 and 1 more fact
- (Space Launch System → part of → Artemis program) inferred: through Artemis I, as “part of” carries over; stated: The Space Launch System was launched from Complex 39B on November 16, 2022 as part of the Artemis I mission.14
- Victor Glover Person
- (Artemis program → crew members → Victor Glover) The Artemis II crew included the first woman, first Black man, and first Canadian to travel to lunar space.2
- (Victor Glover → affiliation → Artemis program) inferred: implied by “member of”
- (Victor Glover → member of → Artemis program) inferred: implied by “member of the crew of”
- (Victor Glover → member of the crew of → Artemis program) inferred: the other reading of “crew members” (above)
- Artemis III Event
- Constellation program Concept
- (Artemis program → derived from → Constellation program) Booster upgrades initially developed for Ares V are among the systems the Artemis program carries over from the canceled Constellation program.1
- (Artemis program → has part(s) → Constellation program) The Artemis program incorporates components of the canceled Constellation program and the Asteroid Redirect Mission.1
- (Constellation program → followed by → Artemis program) The Constellation program was partially revived as the Artemis program in 2017.16
- (Artemis program → follows → Constellation program) inferred: the other reading of “followed by” (above)
- (Artemis program → influenced by → Constellation program) inferred: implied by “derived from” (above)
- (Constellation program → part of → Artemis program) inferred: the other reading of “has part(s)” (above)
- (Constellation program → source of → Artemis program) inferred: the other reading of “derived from” (above)
- Lunar Gateway Object
- (Artemis program → has part(s) → Lunar Gateway) The Artemis collaboration was planned to provide an orbiting Lunar Gateway and to accomplish the first crewed lunar landing in 50 years.8
- (Artemis program → derived from → Lunar Gateway) Space Policy Directive 1 authorized the lunar-focused campaign later named Artemis, drawing on legacy US programs including the Orion space capsule, the Lunar Gateway space station, and Commercial Lunar Payload Services.1
- (Lunar Gateway → part of → Artemis program) The Lunar Gateway was a planned modular space station that would have been assembled in orbit around the Moon as part of the Artemis program.1
- (Artemis program → influenced by → Lunar Gateway) inferred: implied by “derived from” (above)
- (Lunar Gateway → source of → Artemis program) inferred: the other reading of “derived from” (above)
Show 60 more connections
- Jeremy Hansen Person
- (Artemis program → crew members → Jeremy Hansen) The Artemis II crew included the first woman, first Black man, and first Canadian to travel to lunar space.2
- (Jeremy Hansen → affiliation → Artemis program) inferred: implied by “member of”
- (Jeremy Hansen → member of → Artemis program) inferred: implied by “member of the crew of”
- (Jeremy Hansen → member of the crew of → Artemis program) inferred: the other reading of “crew members” (above)
- Ares V Object
- (Artemis program → derived from → Ares V) Booster upgrades initially developed for Ares V are among the systems the Artemis program carries over from the canceled Constellation program.1
- (Artemis program → has part(s) → Ares V) inferred: through Constellation program, as “has part(s)” carries over; stated: The Artemis program incorporates components of the canceled Constellation program and the Asteroid Redirect Mission.1
- (Artemis program → influenced by → Ares V) inferred: implied by “derived from” (above)
- (Ares V → part of → Artemis program) inferred: through Constellation program, as “part of” carries over; stated: Ares V was the planned cargo launch component of NASA's cancelled Constellation program.17
- (Ares V → source of → Artemis program) inferred: the other reading of “derived from” (above)
- Artemis IV Event
-
- (Artemis program → derived from → Commercial Lunar Payload Services) Space Policy Directive 1 authorized the lunar-focused campaign later named Artemis, drawing on legacy US programs including the Orion space capsule, the Lunar Gateway space station, and Commercial Lunar Payload Services.1
- (Artemis program → influenced by → Commercial Lunar Payload Services) inferred: implied by “derived from” (above)
- (Commercial Lunar Payload Services → source of → Artemis program) inferred: the other reading of “derived from” (above)
- Starship HLS Object
- (Starship HLS → part of → Artemis program) The Starship Human Landing System is a crewed variant being developed under a contract with NASA as part of the Artemis program.19 and 2 more facts
- (Artemis program → has part(s) → Starship HLS) inferred: the other reading of “part of” (above)
- Blue Moon Group
- (Blue Moon → part of → Artemis program) Blue Moon Mark 2 is a crewed lunar lander being developed by Blue Origin for NASA's Human Landing System program as part of the Artemis program.20
- (Artemis program → has part(s) → Blue Moon) inferred: the other reading of “part of” (above)
- Orion Concept
- (Artemis program → derived from → Orion) Space Policy Directive 1 authorized the lunar-focused campaign later named Artemis, drawing on legacy US programs including the Orion space capsule, the Lunar Gateway space station, and Commercial Lunar Payload Services.1
- (Artemis program → has part(s) → Orion) The core infrastructure of the Artemis program consists of SLS, Orion, and the HLS.1
- (Artemis program → influenced by → Orion) inferred: implied by “derived from” (above)
- (Orion → part of → Artemis program) inferred: the other reading of “has part(s)” (above)
- (Orion → source of → Artemis program) inferred: the other reading of “derived from” (above)
- Orion (2026) Concept
- (Orion (2026) → part of → Artemis program) Orion is a spacecraft capable of lunar missions with a crew of four, used as part of NASA's Artemis program.20
- (Artemis program → has part(s) → Orion (2026)) inferred: the other reading of “part of” (above)
- Lunar south pole Place
- (Artemis program → location of landing → Lunar south pole) The Artemis program plans to use rendezvous in a near-rectilinear halo orbit near the Moon to land humans on the lunar south pole region.7
- (Artemis program → location → Lunar south pole) inferred: implied by “location of landing” (above)
- Artemis V Event
- Asteroid Redirect Mission Event
- (Artemis program → has part(s) → Asteroid Redirect Mission) The Artemis program incorporates components of the canceled Constellation program and the Asteroid Redirect Mission.1
- (Asteroid Redirect Mission → part of → Artemis program) inferred: the other reading of “has part(s)” (above)
- Moonbase Place
- (Artemis program → has goal → Moonbase) The Artemis program aims to build a permanent lunar base.1
- Space policy of the first Trump administration Organization
- (Artemis program → derived from → Space policy of the first Trump administration) Space Policy Directive 1 authorized the lunar-focused campaign later named Artemis, drawing on legacy US programs including the Orion space capsule, the Lunar Gateway space station, and Commercial Lunar Payload Services.1
- (Artemis program → influenced by → Space policy of the first Trump administration) inferred: implied by “derived from” (above)
- (Space policy of the first Trump administration → source of → Artemis program) inferred: the other reading of “derived from” (above)
- Kennedy Space Center Concept
- (Artemis program → start point → Kennedy Space Center) from Wikidata
- (Artemis program → location → Kennedy Space Center) inferred: implied by “start point” (from Wikidata)
- SpaceX Starship Object
- (Artemis program → has part(s) → SpaceX Starship) from Wikidata
- (SpaceX Starship → part of → Artemis program) from Wikidata
-
- (Artemis program → start point → Cape Canaveral Space Force Station) from Wikidata
- (Artemis program → location → Cape Canaveral Space Force Station) inferred: implied by “start point” (from Wikidata)
- Exploration of the Moon Place
- (Artemis program → has goal → Exploration of the Moon) from Wikidata
- Screw Object
- (Artemis program → has part(s) → Screw) inferred: the other reading of “part of”
- (Screw → part of → Artemis program) inferred: the other reading of “has part(s)”
- Hydrazine Concept
- (Artemis program → has part(s) → Hydrazine) inferred: the other reading of “part of”
- (Hydrazine → part of → Artemis program) inferred: the other reading of “has part(s)”
- Cape Canaveral Place
- (Artemis program → location → Cape Canaveral) inferred: through Cape Canaveral Space Force Station, as “location” carries over
- Ares I Object
- (Artemis program → has part(s) → Ares I) inferred: through Constellation program, as “has part(s)” carries over; stated: The Artemis program incorporates components of the canceled Constellation program and the Asteroid Redirect Mission.1
- (Ares I → part of → Artemis program) inferred: the other reading of “has part(s)”
- SpaceX Raptor Object
- (Artemis program → has part(s) → SpaceX Raptor) inferred: through SpaceX Starship, as “has part(s)” carries over
- (SpaceX Raptor → part of → Artemis program) inferred: through SpaceX Starship, as “part of” carries over
- O-ring Object
- (Artemis program → has part(s) → O-ring) inferred: the other reading of “part of”
- (O-ring → part of → Artemis program) inferred: the other reading of “has part(s)”
- RS-25 Object
- (Artemis program → has part(s) → RS-25) inferred: through Artemis II, as “has part(s)” carries over; stated: As of 2026, the Artemis program has flown two successful missions, Artemis I and Artemis II.1
- (RS-25 → part of → Artemis program) inferred: through Artemis II, as “part of” carries over; stated: Artemis II, the first crewed mission of the Artemis program, was planned to launch on April 1, 2026 on a free-return flyby of the Moon.12
-
- (Artemis program → has part(s) → Space Shuttle Solid Rocket Booster) inferred: the other reading of “part of”
- (Space Shuttle Solid Rocket Booster → part of → Artemis program) inferred: the other reading of “has part(s)”
- Space Shuttle external tank Object
- (Artemis program → has part(s) → Space Shuttle external tank) inferred: through Artemis II, as “has part(s)” carries over; stated: As of 2026, the Artemis program has flown two successful missions, Artemis I and Artemis II.1
- (Space Shuttle external tank → part of → Artemis program) inferred: through Artemis II, as “part of” carries over; stated: Artemis II, the first crewed mission of the Artemis program, was planned to launch on April 1, 2026 on a free-return flyby of the Moon.12
- Altair Concept
- (Artemis program → has part(s) → Altair) inferred: through Constellation program, as “has part(s)” carries over; stated: The Artemis program incorporates components of the canceled Constellation program and the Asteroid Redirect Mission.1
- (Altair → part of → Artemis program) inferred: through Constellation program, as “part of” carries over; stated: Altair, also known as the Lunar Surface Access Module, was the planned lunar lander component of the Constellation program.20
- Earth Departure Stage Object
- (Artemis program → has part(s) → Earth Departure Stage) inferred: the other reading of “part of”
- (Earth Departure Stage → part of → Artemis program) inferred: the other reading of “has part(s)”
- European Service Module Object
- (Artemis program → has part(s) → European Service Module) inferred: through Artemis I, as “has part(s)” carries over; stated: The United States began the Artemis program with the launch of Artemis I in 2022.4
- (European Service Module → part of → Artemis program) inferred: through Artemis I, as “part of” carries over; stated: The European Service Module for Artemis I made its first flight on November 16, 2022, as the first major milestone in NASA's Artemis program to return humans to the Moon.13
- SpaceX Super Heavy Work
- (Artemis program → has part(s) → SpaceX Super Heavy) inferred: through SpaceX Starship, as “has part(s)” carries over
- (SpaceX Super Heavy → part of → Artemis program) inferred: through SpaceX Starship, as “part of” carries over; stated: In the fourth Starship flight test, the Super Heavy booster achieved a soft splashdown and the ship survived atmospheric re-entry despite significant damage to its flight control surfaces.19
- SpaceX Starship Work
- (Artemis program → has part(s) → SpaceX Starship) inferred: through SpaceX Starship, as “has part(s)” carries over
- (SpaceX Starship → part of → Artemis program) inferred: through SpaceX Starship, as “part of” carries over
-
- (Artemis program → has part(s) → Interim Cryogenic Propulsion Stage) inferred: through Artemis I, as “has part(s)” carries over; stated: The United States began the Artemis program with the launch of Artemis I in 2022.4
- (Interim Cryogenic Propulsion Stage → part of → Artemis program) inferred: through Artemis I, as “part of” carries over; stated: The European Service Module for Artemis I made its first flight on November 16, 2022, as the first major milestone in NASA's Artemis program to return humans to the Moon.13
- Intertank Concept
- (Artemis program → has part(s) → Intertank) inferred: through Artemis II, as “has part(s)” carries over; stated: As of 2026, the Artemis program has flown two successful missions, Artemis I and Artemis II.1
- (Intertank → part of → Artemis program) inferred: through Artemis II, as “part of” carries over; stated: Artemis II, the first crewed mission of the Artemis program, was planned to launch on April 1, 2026 on a free-return flyby of the Moon.12
- Liquid hydrogen tank Concept
- (Artemis program → has part(s) → Liquid hydrogen tank) inferred: through Artemis II, as “has part(s)” carries over; stated: As of 2026, the Artemis program has flown two successful missions, Artemis I and Artemis II.1
- (Liquid hydrogen tank → part of → Artemis program) inferred: through Artemis II, as “part of” carries over; stated: Artemis II, the first crewed mission of the Artemis program, was planned to launch on April 1, 2026 on a free-return flyby of the Moon.12
- Modem Object
- (Artemis program → has part(s) → Modem) inferred: through Artemis II, as “has part(s)” carries over; stated: As of 2026, the Artemis program has flown two successful missions, Artemis I and Artemis II.1
- (Modem → part of → Artemis program) inferred: through Artemis II, as “part of” carries over; stated: Artemis II, the first crewed mission of the Artemis program, was planned to launch on April 1, 2026 on a free-return flyby of the Moon.12
- Auxiliary power unit Object
- (Artemis program → has part(s) → Auxiliary power unit) inferred: the other reading of “part of”
- (Auxiliary power unit → part of → Artemis program) inferred: the other reading of “has part(s)”
- Hypergolic propellant Object
- (Artemis program → has part(s) → Hypergolic propellant) inferred: through Artemis I, as “has part(s)” carries over; stated: The United States began the Artemis program with the launch of Artemis I in 2022.4
- (Hypergolic propellant → part of → Artemis program) inferred: through Artemis I, as “part of” carries over; stated: The European Service Module for Artemis I made its first flight on November 16, 2022, as the first major milestone in NASA's Artemis program to return humans to the Moon.13
- Drogue parachute Concept
- (Artemis program → has part(s) → Drogue parachute) inferred: the other reading of “part of”
- (Drogue parachute → part of → Artemis program) inferred: the other reading of “has part(s)”
- RL10 Object
- (Artemis program → has part(s) → RL10) inferred: through Artemis I, as “has part(s)” carries over; stated: The United States began the Artemis program with the launch of Artemis I in 2022.4
- (RL10 → part of → Artemis program) inferred: through Artemis I, as “part of” carries over; stated: The European Service Module for Artemis I made its first flight on November 16, 2022, as the first major milestone in NASA's Artemis program to return humans to the Moon.13
- RS-68 Object
- (Artemis program → has part(s) → RS-68) inferred: the other reading of “part of”
- (RS-68 → part of → Artemis program) inferred: the other reading of “has part(s)”
- Hydraulic pump Concept
- (Artemis program → has part(s) → Hydraulic pump) inferred: the other reading of “part of”
- (Hydraulic pump → part of → Artemis program) inferred: the other reading of “has part(s)”
- Relief valve Concept
- (Artemis program → has part(s) → Relief valve) inferred: the other reading of “part of”
- (Relief valve → part of → Artemis program) inferred: the other reading of “has part(s)”
- AJ10 Object
- (Artemis program → has part(s) → AJ10) inferred: through Artemis II, as “has part(s)” carries over; stated: As of 2026, the Artemis program has flown two successful missions, Artemis I and Artemis II.1
- (AJ10 → part of → Artemis program) inferred: through Artemis II, as “part of” carries over; stated: Artemis II, the first crewed mission of the Artemis program, was planned to launch on April 1, 2026 on a free-return flyby of the Moon.12
- High-strength low-alloy steel Concept
- (Artemis program → has part(s) → High-strength low-alloy steel) inferred: the other reading of “part of”
- (High-strength low-alloy steel → part of → Artemis program) inferred: the other reading of “has part(s)”
- Pyrotechnic fastener Concept
- (Artemis program → has part(s) → Pyrotechnic fastener) inferred: the other reading of “part of”
- (Pyrotechnic fastener → part of → Artemis program) inferred: the other reading of “has part(s)”
- J-2X Object
- (Artemis program → has part(s) → J-2X) inferred: the other reading of “part of”
- (J-2X → part of → Artemis program) inferred: the other reading of “has part(s)”
- Starship flight test 9 Object
- (Artemis program → has part(s) → Starship flight test 9) inferred: through SpaceX Starship, as “has part(s)” carries over
- (Starship flight test 9 → part of → Artemis program) inferred: through SpaceX Starship, as “part of” carries over
- Ammonium perchlorate composite propellant Object
- (Artemis program → has part(s) → Ammonium perchlorate composite propellant) inferred: the other reading of “part of”
- (Ammonium perchlorate composite propellant → part of → Artemis program) inferred: the other reading of “has part(s)”
- Polybutadiene acrylonitrile Object
- (Artemis program → has part(s) → Polybutadiene acrylonitrile) inferred: the other reading of “part of”
- (Polybutadiene acrylonitrile → part of → Artemis program) inferred: the other reading of “has part(s)”
- SAE 304 stainless steel Concept
- (Artemis program → has part(s) → SAE 304 stainless steel) inferred: through SpaceX Starship, as “has part(s)” carries over
- (SAE 304 stainless steel → part of → Artemis program) inferred: through SpaceX Starship, as “part of” carries over
- Booster separation motor Object
- (Artemis program → has part(s) → Booster separation motor) inferred: the other reading of “part of”
- (Booster separation motor → part of → Artemis program) inferred: the other reading of “has part(s)”
- Space Launch System core stage Object
- (Artemis program → has part(s) → Space Launch System core stage) inferred: through Artemis II, as “has part(s)” carries over; stated: As of 2026, the Artemis program has flown two successful missions, Artemis I and Artemis II.1
- (Space Launch System core stage → part of → Artemis program) inferred: through Artemis II, as “part of” carries over; stated: The Artemis II core stage made a destructive reentry over the Pacific Ocean about two hours after launch.23
- Orion flywheel exercise device Object
- (Artemis program → has part(s) → Orion flywheel exercise device) inferred: through Artemis I, as “has part(s)” carries over; stated: The United States began the Artemis program with the launch of Artemis I in 2022.4
- (Orion flywheel exercise device → part of → Artemis program) inferred: through Artemis I, as “part of” carries over; stated: The European Service Module for Artemis I made its first flight on November 16, 2022, as the first major milestone in NASA's Artemis program to return humans to the Moon.13
- 2219 aluminium alloy Concept
- (Artemis program → has part(s) → 2219 aluminium alloy) inferred: through Artemis I, as “has part(s)” carries over; stated: The United States began the Artemis program with the launch of Artemis I in 2022.4
- (2219 aluminium alloy → part of → Artemis program) inferred: through Artemis I, as “part of” carries over; stated: The European Service Module for Artemis I made its first flight on November 16, 2022, as the first major milestone in NASA's Artemis program to return humans to the Moon.13
- B12 Concept
- (Artemis program → has part(s) → B12) inferred: through SpaceX Starship, as “has part(s)” carries over
- (B12 → part of → Artemis program) inferred: through SpaceX Starship, as “part of” carries over; stated: In October 2024, the sixth Starship flight test was not the only flight; the fifth flight test flew S30 and B12 on October 13, 2024, with B12 returning to the launch site for a catch for the first time.19
- Block 1 Concept
- (Artemis program → has part(s) → Block 1) inferred: through Artemis I, as “has part(s)” carries over; stated: The United States began the Artemis program with the launch of Artemis I in 2022.4
- (Block 1 → part of → Artemis program) inferred: through Artemis I, as “part of” carries over; stated: The European Service Module for Artemis I made its first flight on November 16, 2022, as the first major milestone in NASA's Artemis program to return humans to the Moon.13
- Booster 14 Concept
- (Artemis program → has part(s) → Booster 14) inferred: through SpaceX Starship, as “has part(s)” carries over
- (Booster 14 → part of → Artemis program) inferred: through SpaceX Starship, as “part of” carries over
- Booster 9 Concept
- (Artemis program → has part(s) → Booster 9) inferred: through SpaceX Starship, as “has part(s)” carries over
- (Booster 9 → part of → Artemis program) inferred: through SpaceX Starship, as “part of” carries over; stated: In the second Starship flight test, the booster was destroyed about three and a half minutes into the flight at an altitude of about 90 km over the Gulf of Mexico, after a blockage in a liquid oxygen filter caused an engine failure.19
- ICPS Concept
- (Artemis program → has part(s) → ICPS) inferred: through Artemis II, as “has part(s)” carries over; stated: As of 2026, the Artemis program has flown two successful missions, Artemis I and Artemis II.1
- (ICPS → part of → Artemis program) inferred: through Artemis II, as “part of” carries over; stated: The Artemis II ICPS upper stage did not fire during the initial ascent.23
- Orion Artemis II Optical Communications System Concept
- (Artemis program → has part(s) → Orion Artemis II Optical Communications System) inferred: through Artemis II, as “has part(s)” carries over; stated: As of 2026, the Artemis program has flown two successful missions, Artemis I and Artemis II.1
- (Orion Artemis II Optical Communications System → part of → Artemis program) inferred: through Artemis II, as “part of” carries over; stated: Artemis II, the first crewed mission of the Artemis program, was planned to launch on April 1, 2026 on a free-return flyby of the Moon.12
Also linked: Orion Crew Module (∴ has part(s)), RVac (∴ has part(s)), Ship 28 (∴ has part(s)), Ship 34 (∴ has part(s)), Universal Waste Management System (∴ has part(s)).
Named together
Subjects that share a fact with Artemis program, with no typed link between them yet.
- Apollo program 4 shared facts
- On May 16, 2019, NASA Administrator Jim Bridenstine announced that the new program would be named Artemis, after the goddess of the Moon in Greek mythology who is the twin sister of Apollo.1
- European Space Agency 3 shared facts
- The European Space Agency collaborates with NASA on the Artemis programme, especially by manufacturing the European Service Module of the Orion spacecraft.8
- SpaceX 3 shared facts
- SpaceX was one of three teams selected to develop competing lunar lander designs for the Artemis program over a year-long period starting in May 2020.24
- Kennedy Space Center Launch Complex 39 3 shared facts
- Launch Complex 39B has been configured for use by NASA's Space Launch System rocket, a Shuttle-derived vehicle used in the Artemis program and later Moon to Mars campaigns.25
- Moon 2 shared facts
- The Apollo missions were explorational in nature, while the Artemis program plans to establish a more permanent presence on the Moon.10
- Blue Origin 2 shared facts
- Blue Origin is working on the Blue Moon human lunar lander for NASA's Artemis program.26
- Kennedy Space Center Launch Complex 39B 2 shared facts
- Launch Complex 39B is used by NASA's Space Launch System, a Shuttle-derived launch vehicle, since Artemis I in 2022.14
- Human Landing System 2 shared facts
- The Human Landing System is in development by private spaceflight companies under contract for the Artemis program.1
- Donald Trump 1 shared fact
- The Artemis program was formally established via Space Policy Directive-1 in 2017 by President Donald Trump.1
- Mike Pence 1 shared fact
- In March 2019, Vice President Mike Pence formally announced that the Artemis program mission will include the first woman and person of color to travel to the lunar surface.2
- Canadian Space Agency 1 shared fact
- Hansen and Gibbons were selected by the Canadian Space Agency as part of a 2020 treaty between the United States and Canada that facilitated Canadian astronauts' participation in the Artemis program.23
- Artemis Accords 1 shared fact
- International collaborations in the Artemis program are bound by the Artemis Accords.1
- Commercial Crew Program 1 shared fact
- Commercial Crew Program and the Artemis program are two major programs for human spaceflight in the 2010s.12
- One Big Beautiful Bill Act 1 shared fact
- The One Big Beautiful Bill Act signed in July 2025 included a provision to fund procurement of Orion for Artemis IV and reuse in future missions.13
- NASA Office of Inspector General 1 shared fact
- On November 15, 2021, an audit by NASA's Office of Inspector General estimated the true cost of the Artemis program at about $93 billion until 2025.1
- Launch Complex 39C 1 shared fact
- Launch Complex 39C became unavailable to users because Artemis use of Launch Complex 39B would take over the site, which lies within the 39B perimeter.14
Also named with Artemis program: Greek mythology, Second presidency of Donald Trump, Jim Bridenstine, Presidency of Joe Biden, Extravehicular Mobility Unit, Brian Babin, International Lunar Research Station, United States federal budget, United States House Committee on Appropriations, Near-rectilinear halo orbit, ESA, Pressurized Rover.
Artemis program: facts
44 facts in 10 categories · rated most surprising
What it is (9 facts)
- The Artemis program aims to return humans to the Moon for the first time since the Apollo program.1
- The Artemis program was formally established via Space Policy Directive-1 in 2017 by President Donald Trump.1
- The Artemis program is a Moon exploration program led by the United States' National Aeronautics and Space Administration (NASA).1
- The Artemis program aims to build a permanent lunar base.1
- International collaborations in the Artemis program are bound by the Artemis Accords.1
- The Artemis program is organized around a series of missions of increasing complexity, intended to be spaced about a year apart.1
- The Artemis program incorporates components of the canceled Constellation program and the Asteroid Redirect Mission.1
- The Artemis program uses two types of space suit, first unveiled in October 2019: the Orion Crew Survival System for launch and entry, and a next-generation extravehicular mobility unit for lunar surface operations.1
1 more fact in what it is
- The Artemis program is an ongoing crewed spaceflight program carried out by NASA, U.S. commercial spaceflight companies, and international partners such as ESA.3
Life and career (1 fact)
- The Artemis II crew included the first woman, first Black man, and first Canadian to travel to lunar space.2
Making and creation (2 facts)
- On May 16, 2019, NASA Administrator Jim Bridenstine announced that the new program would be named Artemis, after the goddess of the Moon in Greek mythology who is the twin sister of Apollo.1
- Space Policy Directive 1 authorized the lunar-focused campaign later named Artemis, drawing on legacy US programs including the Orion space capsule, the Lunar Gateway space station, and Commercial Lunar Payload Services.1
Events (12 facts)
- In March 2019, Vice President Mike Pence formally announced that the Artemis program mission will include the first woman and person of color to travel to the lunar surface.2
- In April 2026, NASA launched the Artemis II test mission, sending four astronauts around the Moon on a ten-day lunar flyby without entering orbit.2
- The United States began the Artemis program with the launch of Artemis I in 2022.4
- In 2017, NASA shifted its focus to a return to the Moon by 2024 with the Artemis program, with a flight to Mars possibly following.5
- The Artemis program aims to land the first woman and the next man on the Moon, specifically at the lunar south pole region.3
- In 2017, the lunar campaign was authorized by Space Policy Directive 1, using spacecraft programs such as Orion, the Lunar Gateway, and Commercial Lunar Payload Services, and adding an undeveloped crewed lander.3
- Humans are planning to return to the Moon in the 2020s with the Artemis program.6
- The Artemis program plans to use rendezvous in a near-rectilinear halo orbit near the Moon to land humans on the lunar south pole region.7
4 more facts in events
- In the notional Artemis concept of operations, EVA 1 is six hours long and takes place on Day 2 of the lunar stay.1
- In the notional Artemis concept of operations, the final EVA on Day 7 lasts one hour and mostly prepares for the lunar ascent, including jettisoning hardware.1
- The Artemis program had intended to land a crewed mission on the Moon in 2024.2
- The first Artemis mission was launched in 2022.3
Places (2 facts)
By the numbers (4 facts)
- On November 15, 2021, an audit by NASA's Office of Inspector General estimated the true cost of the Artemis program at about $93 billion until 2025.1
- As of 2026, the Artemis program has flown two successful missions, Artemis I and Artemis II.1
- The White House requested a funding increase of 12% for the Artemis program as part of its fiscal year 2021 budget.1
- As of February 2020, a lunar stay during a Phase 1 Artemis mission was planned to last about seven days with five extravehicular activities.1
Details and parts (8 facts)
- Booster upgrades initially developed for Ares V are among the systems the Artemis program carries over from the canceled Constellation program.1
- Refurbished legacy engines from the Space Shuttle program, some dating back to the early 1980s, are used in Artemis program missions.9
- Space Shuttle–derived hardware, including the Space Launch System core stage, its RS-25 engines and solid rocket boosters, is among the principal elements of the Artemis program.1
- Each numbered Artemis mission centers on launching an SLS rocket carrying an Orion spacecraft.1
- The core infrastructure of the Artemis program consists of SLS, Orion, and the HLS.1
- Each Artemis suit is custom-fitted and incorporates flotation devices for post-splashdown survival.1
- From Artemis I to Artemis IV, recycled Shuttle main engines will be used before manufacturing new engines.9
- From Artemis I to Artemis III, recycled Shuttle solid rocket booster engines and steel casings are to be used before building new ones.9
Look and appearances (1 fact)
- The Artemis suits are primarily colored international orange, a high-visibility shade used to aid recovery operations.1
Trivia (1 fact)
- The Artemis name comes from the goddess of the Moon in Greek mythology, the twin sister of Apollo, after which NASA's 1960s moon landing program was named.1
More facts (4 facts)
- The Apollo missions were explorational in nature, while the Artemis program plans to establish a more permanent presence on the Moon.10
- Current lunar programs are multilateral, including the US-led Artemis program and the China-led International Lunar Research Station.10
- The Artemis program aims for new lunar landings in the late 2020s.11
- The Artemis program is a U.S.-led program with a plan to build the Artemis Base Camp on the Moon.3
Mentioned on other pages
68 facts about other subjects name Artemis program; the 24 most surprising
- Second presidency of Donald Trump: In May 2025, the second Trump administration proposed terminating the Orion spacecraft program after Artemis III.13
- SpaceX Starship: SpaceX was awarded in April 2021 a $2.89 billion fixed-price contract from NASA to develop the Starship lunar lander for Artemis III.19
- Constellation program: The Constellation program was partially revived as the Artemis program in 2017.16
- Artemis III: Artemis III was originally planned as the first crewed lunar landing mission of the Artemis program and the first crewed landing on the Moon since Apollo 17 in 1972.15
- Artemis IV: In February 2026, Artemis IV became the first planned lunar landing of the Artemis program.18
- Artemis IV: Artemis IV is planned to be the first Moon landing of the NASA-led Artemis program, marking the first crewed Moon landing since Apollo 17 in 1972.1
- European Space Agency: The European Space Agency collaborates with NASA on the Artemis programme, especially by manufacturing the European Service Module of the Orion spacecraft.8
- European Space Agency: In October 2020, ESA entered into a memorandum of understanding with NASA to collaborate on the Artemis program.8
- One Big Beautiful Bill Act: The One Big Beautiful Bill Act signed in July 2025 included a provision to fund procurement of Orion for Artemis IV and reuse in future missions.13
- Artemis I: The European Service Module for Artemis I made its first flight on November 16, 2022, as the first major milestone in NASA's Artemis program to return humans to the Moon.13
- Starship HLS: The Starship Human Landing System is a crewed variant being developed under a contract with NASA as part of the Artemis program.19
- Blue Origin: Blue Origin is working on the Blue Moon human lunar lander for NASA's Artemis program.26
- Blue Origin: In January 2026, Blue Origin paused New Shepard tourism launches for two years or more to focus on Artemis program lunar landing efforts.26
- SpaceX Starship: In 2022, NASA awarded SpaceX a $1.15 billion fixed-price contract for a second lunar lander for Artemis IV.19
- Starship HLS: NASA initially chose Starship HLS as the sole lunar Human Landing System for the planned Artemis III and Artemis IV missions.19
- Artemis IV: Under the February 2026 restructuring, Artemis IV was made the first Artemis landing attempt, targeted for 2028.19
- Orion: In the Artemis plan, two of the Orion crew's four astronauts would transfer into Starship HLS after docking.19
- Artemis III: After the Artemis program was announced in 2019, the mission was redesignated Artemis III and repurposed as the program's first crewed lunar landing mission.15
- Kennedy Space Center Launch Complex 39: Launch Complex 39B has been configured for use by NASA's Space Launch System rocket, a Shuttle-derived vehicle used in the Artemis program and later Moon to Mars campaigns.25
- Space Shuttle: Some refurbished Space Shuttle-era engines planned for Artemis missions date back to the early 1980s.12
- Artemis II: Artemis II, the first crewed mission of the Artemis program, was planned to launch on April 1, 2026 on a free-return flyby of the Moon.12
- Artemis IV: Artemis IV is planned to be the first Moon landing in the NASA-led Artemis lunar exploration program.18
- Artemis IV: Between October 2022 and February 2026, Artemis IV was set to be the second lunar landing of the Artemis program, after the planned Artemis III.18
- Launch Complex 39C: Launch Complex 39C became unavailable to users because Artemis use of Launch Complex 39B would take over the site, which lies within the 39B perimeter.14
Sources
26 pages the facts on this page were read from
- Artemis program en.wikipedia.org
- Moon landing en.wikipedia.org
- Space exploration en.wikipedia.org
- Space Race en.wikipedia.org
- Exploration of Mars en.wikipedia.org
- Solar System en.wikipedia.org
- Lunar orbit rendezvous en.wikipedia.org
- European Space Agency en.wikipedia.org
- Space Shuttle en.wikipedia.org
- Moon en.wikipedia.org
- Human spaceflight en.wikipedia.org
- Space Shuttle program en.wikipedia.org
- Orion (spacecraft) en.wikipedia.org
- Kennedy Space Center Launch Complex 39 en.wikipedia.org
- Artemis III en.wikipedia.org
- Constellation program en.wikipedia.org
- Ares V en.wikipedia.org
- Artemis IV en.wikipedia.org
- SpaceX Starship en.wikipedia.org
- List of crewed spacecraft en.wikipedia.org
- Earth orbit rendezvous en.wikipedia.org
- Artemis I en.wikipedia.org
- Artemis II en.wikipedia.org
- Starship HLS en.wikipedia.org
- Kennedy Space Center Launch Complex 39B en.wikipedia.org
- Blue Origin en.wikipedia.org
Facts are short sentences the Trivia Zone knowledge graph read from these pages; Wikipedia text is available under CC BY-SA 4.0 and Wikidata under CC0. Names, classes and links come from Wikidata.