Trivia ZoneEncyclopedia
  1. Home
  2. Space exploration
  3. Organizations

NASA Office of Inspector General

U.S. space agency oversight entity

  • Space agency oversight entity
  • 9 facts
  • 6 sources
  • Updated
  • Summary from facts

A November 2021 NASA Office of Inspector General report estimated per-launch production and operating costs of $2.2 billion for the Space Launch System, plus $568 million for Exploration Ground Systems, for at least the first four Artemis launches.1 The NASA Office of Inspector General called NASA's cost savings goals highly unrealistic.1 Close-up imagery of the heat shield damage was not publicly released until May 2024, when it appeared in a report issued by the NASA Office of Inspector General.2

A summary made of NASA Office of Inspector General's own facts, quoted as read; each sentence cites its source.

Connections

0 linked subjects · 11 named together

A link reads subject → relation → subject. Each is stated by a fact (quoted, with its source), taken from Wikidata, or worked out by the knowledge graph's reasoner from the links it was given; inferred links are marked ∴ with the rule behind them.

NASA Office of Inspector General and 10 of its closest connectionsSpace Launch System · named together · Starship HLSSpace Launch System · operator · NASASpace Launch System · named together · SpaceXSpace Launch System · named together · BoeingSpace Launch System · part of · Artemis IISpace Launch System · part of · Artemis programSpace Launch System · part of · Artemis IStarship HLS · contractor for · NASAStarship HLS · developer · SpaceXStarship HLS · part of · Artemis programMars · named together · NASAMars · named together · SpaceXMars · location · Crew DragonNASA · has contractor · SpaceXNASA · has contractor · BoeingNASA · item operated · Artemis IINASA · item operated · Artemis programNASA · item operated · Artemis INASA · named together · Crew DragonSpaceX · named together · BoeingSpaceX · named together · Artemis programSpaceX · item operated · Crew DragonBoeing · named together · Artemis IIBoeing · named together · Artemis IArtemis II · part of · Artemis programArtemis II · follows · Artemis IArtemis program · has part(s) · Artemis ISpace Launch Syst…Starship HLSMarsNASASpaceXBoeingArtemis IIArtemis programArtemis ICrew Dragon
Point at a subject to see how it links to NASA Office of Inspector General.
  • stated
  • inferred
  • named together

Named together

Subjects that share a fact with NASA Office of Inspector General, with no typed link between them yet.

  • Space Launch System 2 shared facts
    • In October 2018, NASA's Inspector General reported that the Boeing core stage contract had made up 40% of the $11.9 billion spent on the Space Launch System as of August 2018.1
  • Starship HLS 2 shared facts
    • In 2021, the NASA Office of Inspector General warned that the HLS development schedule was unrealistic compared with other major NASA spaceflight programs.5
  • Mars 1 shared fact
    • In October 2015, the NASA Office of Inspector General issued a health hazards report related to space exploration, including a human mission to Mars.3
  • NASA 1 shared fact
    • The NASA Office of Inspector General called NASA's cost savings goals highly unrealistic.1
  • SpaceX 1 shared fact
    • SpaceX's contract values each Crew Dragon seat at around US$88 million, while NASA's Office of Inspector General estimated the face value of each seat at around US$55 million.4
  • Boeing 1 shared fact
    • In October 2018, NASA's Inspector General reported that the Boeing core stage contract had made up 40% of the $11.9 billion spent on the Space Launch System as of August 2018.1
  • Artemis II 1 shared fact
    • In October 2024, the NASA Office of Inspector General determined that the Exploration Ground Systems team had exhausted its time reserved for resolving unforeseen issues, so the September 2025 Artemis II launch date would likely be delayed.2
  • Artemis program 1 shared fact
    • On November 15, 2021, an audit by NASA's Office of Inspector General estimated the true cost of the Artemis program at about $93 billion until 2025.6
  • Artemis I 1 shared fact
    • Close-up imagery of the heat shield damage was not publicly released until May 2024, when it appeared in a report issued by the NASA Office of Inspector General.2
  • Crew Dragon 1 shared fact
    • NASA's Office of Inspector General estimated the face value of each Crew Dragon seat at around US$55 million.4
  • Exploration Ground Systems 1 shared fact
    • A November 2021 NASA Office of Inspector General report estimated per-launch production and operating costs of $2.2 billion for the Space Launch System, plus $568 million for Exploration Ground Systems, for at least the first four Artemis launches.1

NASA Office of Inspector General: facts

9 facts in 3 categories · rated most surprising

Events (2 facts)

  • Close-up imagery of the heat shield damage was not publicly released until May 2024, when it appeared in a report issued by the NASA Office of Inspector General.2
  • In October 2015, the NASA Office of Inspector General issued a health hazards report related to space exploration, including a human mission to Mars.3

By the numbers (5 facts)

  • In October 2018, NASA's Inspector General reported that the Boeing core stage contract had made up 40% of the $11.9 billion spent on the Space Launch System as of August 2018.1
  • A November 2021 NASA Office of Inspector General report estimated per-launch production and operating costs of $2.2 billion for the Space Launch System, plus $568 million for Exploration Ground Systems, for at least the first four Artemis launches.1
  • NASA's Office of Inspector General estimated the face value of each Crew Dragon seat at around US$55 million.4
  • The NASA Office of Inspector General estimated that the HLS Program could face up to 3.4 years of delays before operational flights.5
  • The NASA Office of Inspector General noted that space flight programs in the prior 15 years had taken on average 8.5 years from contract award to first operational flight.5

Reception and legacy (2 facts)

  • The NASA Office of Inspector General called NASA's cost savings goals highly unrealistic.1
  • In 2021, the NASA Office of Inspector General warned that the HLS development schedule was unrealistic compared with other major NASA spaceflight programs.5

Mentioned on other pages

3 facts about other subjects name NASA Office of Inspector General

  • SpaceX: SpaceX's contract values each Crew Dragon seat at around US$88 million, while NASA's Office of Inspector General estimated the face value of each seat at around US$55 million.4
  • Artemis program: On November 15, 2021, an audit by NASA's Office of Inspector General estimated the true cost of the Artemis program at about $93 billion until 2025.6
  • Artemis II: In October 2024, the NASA Office of Inspector General determined that the Exploration Ground Systems team had exhausted its time reserved for resolving unforeseen issues, so the September 2025 Artemis II launch date would likely be delayed.2

Sources

6 pages the facts on this page were read from

  1. Space Launch System en.wikipedia.org
  2. Artemis II en.wikipedia.org
  3. Astronaut en.wikipedia.org
  4. SpaceX Dragon 2 en.wikipedia.org
  5. Starship HLS en.wikipedia.org
  6. Artemis program en.wikipedia.org

Facts are short sentences the Trivia Zone knowledge graph read from these pages; Wikipedia text is available under CC BY-SA 4.0 and Wikidata under CC0. Names, classes and links come from Wikidata.