Interim Cryogenic Propulsion Stage
The Interim Cryogenic Propulsion Stage is the upper stage used on the initial Block 1 configuration of the Space Launch System.1 The Interim Cryogenic Propulsion Stage was derived from the Delta Cryogenic Second Stage designed by Japan's space agency.1 The Interim Cryogenic Propulsion Stage fired its engine for a trans-lunar injection burn that placed the Orion spacecraft and 10 CubeSats on a trajectory to the Moon.2
A summary made of Interim Cryogenic Propulsion Stage's own facts, quoted as read; each sentence cites its source.
Connections
7 linked subjects · 8 links inferred · 11 named together
A link reads subject → relation → subject. Each is stated by a fact (quoted, with its source), taken from Wikidata, or worked out by the knowledge graph's reasoner from the links it was given; inferred links are marked ∴ with the rule behind them.
- stated
- inferred
- named together
- Artemis II Object
- (Interim Cryogenic Propulsion Stage → part of → Artemis II) The ICPS on the Artemis II mission was equipped with a docking target that let Orion's crew test manual maneuvering relative to another spacecraft using onboard navigation sensors and reaction control thrusters.3
- (Artemis II → has part(s) → Interim Cryogenic Propulsion Stage) inferred: through Space Launch System, as “has part(s)” carries over; stated: On January 18, 2026, the integrated SLS rocket, Orion capsule and launch tower were rolled out from the Vehicle Assembly Building to Kennedy Space Center Launch Complex 39B.3
- Artemis I Object
- (Artemis I → has part(s) → Interim Cryogenic Propulsion Stage) A helium check valve on the ICPS upper stage was kept semi-open by a small piece of rubber from one of the mobile launcher's umbilical arms, forcing a delay in fueling the stage until the valve could be replaced in the Vehicle Assembly Building.2
- (Interim Cryogenic Propulsion Stage → part of → Artemis I) inferred: through Space Launch System, as “part of” carries over; stated: The Interim Cryogenic Propulsion Stage was the first part of the SLS delivered to Kennedy Space Center, in July 2017.2
- Space Launch System Object
- (Interim Cryogenic Propulsion Stage → part of → Space Launch System) The Interim Cryogenic Propulsion Stage was the first part of the SLS delivered to Kennedy Space Center, in July 2017.2
- (Space Launch System → has part(s) → Interim Cryogenic Propulsion Stage) The Space Launch System currently uses the Interim Cryogenic Propulsion Stage as its second stage.4
- United Launch Alliance Organization
- (United Launch Alliance → product or material produced → Interim Cryogenic Propulsion Stage) Three Interim Cryogenic Propulsion Stage units were built by United Launch Alliance, a joint venture of Boeing and Lockheed Martin.1
- RL10 Object
- (Interim Cryogenic Propulsion Stage → powered by → RL10) The upper stage of Artemis I's Space Launch System, known as the Interim Cryogenic Propulsion Stage, was powered by a single RL10B-2 engine.2
- (Interim Cryogenic Propulsion Stage → has part(s) → RL10) inferred: implied by “powered by” (above)
- (RL10 → part of → Interim Cryogenic Propulsion Stage) inferred: the other reading of “has part(s)”
- Delta Cryogenic Second Stage Work
- (Interim Cryogenic Propulsion Stage → derived from → Delta Cryogenic Second Stage) The Interim Cryogenic Propulsion Stage was derived from the Delta Cryogenic Second Stage designed by Japan's space agency.1 and 2 more facts
- (Interim Cryogenic Propulsion Stage → influenced by → Delta Cryogenic Second Stage) inferred: implied by “derived from” (above)
- (Delta Cryogenic Second Stage → source of → Interim Cryogenic Propulsion Stage) inferred: the other reading of “derived from” (above)
- Artemis program Concept
- (Interim Cryogenic Propulsion Stage → part of → Artemis program) inferred: through Artemis I, as “part of” carries over; stated: The European Service Module for Artemis I made its first flight on November 16, 2022, as the first major milestone in NASA's Artemis program to return humans to the Moon.6
- (Artemis program → has part(s) → Interim Cryogenic Propulsion Stage) inferred: through Artemis I, as “has part(s)” carries over; stated: The United States began the Artemis program with the launch of Artemis I in 2022.7
Named together
Subjects that share a fact with Interim Cryogenic Propulsion Stage, with no typed link between them yet.
- Artemis III 4 shared facts
- Artemis III will have no Interim Cryogenic Propulsion Stage, as it is only a mission to low Earth orbit, and its stage will be used for Artemis IV instead.1
- Orion 4 shared facts
- Orion's perigee was suborbital before the ICPS burn on the Artemis II mission, a deliberate safety measure that ensured a natural reentry without any additional burns in the event of a major anomaly.3
- NASA 1 shared fact
- NASA determined that preserving the Interim Cryogenic Propulsion Stage outweighed the advantages of a high Earth orbit mission, which would have more closely simulated conditions near the Moon and provided a more rigorous test of Orion's systems.8
- Boeing 1 shared fact
- Three Interim Cryogenic Propulsion Stage units were built by United Launch Alliance, a joint venture of Boeing and Lockheed Martin.1
- Kennedy Space Center 1 shared fact
- The Interim Cryogenic Propulsion Stage was the first part of the SLS delivered to Kennedy Space Center, in July 2017.2
- Lockheed Martin 1 shared fact
- Three Interim Cryogenic Propulsion Stage units were built by United Launch Alliance, a joint venture of Boeing and Lockheed Martin.1
- Orion 1 shared fact
- The Interim Cryogenic Propulsion Stage fired its engine for a trans-lunar injection burn that placed the Orion spacecraft and 10 CubeSats on a trajectory to the Moon.2
- Pacific Ocean 1 shared fact
- After the demonstration, the ICPS performed a deorbit burn for destructive reentry over the Pacific Ocean and deployed its rideshare CubeSats during this phase.3
- CubeSat 1 shared fact
- After the demonstration, the ICPS performed a deorbit burn for destructive reentry over the Pacific Ocean and deployed its rideshare CubeSats during this phase.3
- National Space Development Agency of Japan 1 shared fact
- The Interim Cryogenic Propulsion Stage was derived from the Delta Cryogenic Second Stage designed by Japan's space agency.1
- ArgoMoon 1 shared fact
- ArgoMoon, designed by Argotec and coordinated by the Italian Space Agency, was designed to image the Interim Cryogenic Propulsion Stage.2
Interim Cryogenic Propulsion Stage: facts
14 facts in 4 categories · rated most surprising
What it is (1 fact)
- The Interim Cryogenic Propulsion Stage is the upper stage used on the initial Block 1 configuration of the Space Launch System.1
Making and creation (3 facts)
- The Interim Cryogenic Propulsion Stage was derived from the Delta Cryogenic Second Stage designed by Japan's space agency.1
- Three Interim Cryogenic Propulsion Stage units were built by United Launch Alliance, a joint venture of Boeing and Lockheed Martin.1
- The Interim Cryogenic Propulsion Stage is derived from the Delta Cryogenic Second Stage, incorporating minimal modifications for integration with the Space Launch System.1
Events (5 facts)
- The Interim Cryogenic Propulsion Stage fired its engine for a trans-lunar injection burn that placed the Orion spacecraft and 10 CubeSats on a trajectory to the Moon.2
- The Interim Cryogenic Propulsion Stage was the first part of the SLS delivered to Kennedy Space Center, in July 2017.2
- The ICPS was sent into a heliocentric orbit about three and a half hours after the Artemis I launch.2
- After the demonstration, the ICPS performed a deorbit burn for destructive reentry over the Pacific Ocean and deployed its rideshare CubeSats during this phase.3
- The ICPS burn on the Artemis II mission raised Orion's perigee out of the atmosphere, placing the spacecraft into a stable low Earth orbit.3
Details and parts (5 facts)
- The Interim Cryogenic Propulsion Stage uses the RL10 engine and was derived from the Delta Cryogenic Second Stage.4
- The Interim Cryogenic Propulsion Stage uses the RL10 engine.1
- The Interim Cryogenic Propulsion Stage flown on Artemis I was powered by a single RL10B-2 engine.1
- The upper stage of Artemis I's Space Launch System, known as the Interim Cryogenic Propulsion Stage, was powered by a single RL10B-2 engine.2
- The ICPS on the Artemis II mission was equipped with a docking target that let Orion's crew test manual maneuvering relative to another spacecraft using onboard navigation sensors and reaction control thrusters.3
Mentioned on other pages
14 facts about other subjects name Interim Cryogenic Propulsion Stage
- Artemis III: Artemis III will have no Interim Cryogenic Propulsion Stage, as it is only a mission to low Earth orbit, and its stage will be used for Artemis IV instead.1
- Artemis I: A helium check valve on the ICPS upper stage was kept semi-open by a small piece of rubber from one of the mobile launcher's umbilical arms, forcing a delay in fueling the stage until the valve could be replaced in the Vehicle Assembly Building.2
- Artemis III: NASA announced in May 2026 that Artemis III will not use its one remaining Interim Cryogenic Propulsion Stage, preserving it for Artemis IV.8
- Artemis III: NASA will use a spacer, a representation of the overall dimensions of an upper stage without propulsive capabilities, in place of the Interim Cryogenic Propulsion Stage on Artemis III.8
- Artemis III: Planners selected an approximately 230-nautical-mile (430 km; 260 mi) low Earth orbit mission for Artemis III instead of a high Earth orbit profile, allowing NASA to preserve an Interim Cryogenic Propulsion Stage for use on Artemis IV.8
- ArgoMoon: ArgoMoon, designed by Argotec and coordinated by the Italian Space Agency, was designed to image the Interim Cryogenic Propulsion Stage.2
- Space Launch System: For Artemis III, the SLS rocket would fly without an Interim Cryogenic Propulsion Stage and instead use a non-propulsive spacer with the same dimensions and interface points.8
- NASA: NASA determined that preserving the Interim Cryogenic Propulsion Stage outweighed the advantages of a high Earth orbit mission, which would have more closely simulated conditions near the Moon and provided a more rigorous test of Orion's systems.8
- Artemis II: During Artemis II's high Earth orbit phase, the crew performed a rendezvous and proximity operations demonstration using the spent Interim Cryogenic Propulsion Stage as a target.3
- Orion: Orion's perigee was suborbital before the ICPS burn on the Artemis II mission, a deliberate safety measure that ensured a natural reentry without any additional burns in the event of a major anomaly.3
- Artemis II: During the Artemis II mission, the crew conducted a proximity operations demonstration using the ICPS as a target.3
- Artemis I: The ICPS fired for approximately eighteen minutes in a trans-lunar injection maneuver about eighty-nine minutes after liftoff of Artemis I.2
- Orion: The ICPS burn that consumed nearly all its fuel was followed by Orion and the European Service Module separating from the upper stage.3
- Space Launch System: The Space Launch System currently uses the Interim Cryogenic Propulsion Stage as its second stage.4
Sources
8 pages the facts on this page were read from
- Space Launch System en.wikipedia.org
- Artemis I en.wikipedia.org
- Artemis II en.wikipedia.org
- Artemis program en.wikipedia.org
- Kennedy Space Center Launch Complex 39 en.wikipedia.org
- Orion (spacecraft) en.wikipedia.org
- Space Race en.wikipedia.org
- Artemis III en.wikipedia.org
Facts are short sentences the Trivia Zone knowledge graph read from these pages; Wikipedia text is available under CC BY-SA 4.0 and Wikidata under CC0. Names, classes and links come from Wikidata.