Trivia ZoneEncyclopedia
  1. Home
  2. Space exploration
  3. Objects

RS-25

Space Shuttle and SLS main engine

  • Shuttle
  • 22 facts
  • 24 sources
  • Updated
  • Summary from facts

The RS-25 is a staged-combustion cycle cryogenic engine that used liquid oxygen and hydrogen and had a higher chamber pressure than any previous liquid-fueled rocket.1 The beginning of development of the RS-25 Space Shuttle Main Engine was delayed for nine months while Pratt & Whitney challenged the contract that had been issued to Rocketdyne.1 The final two RS-25D engines needed for the Space Launch System were assembled from existing RS-25D spare parts.2

A summary made of RS-25's own facts, quoted as read; each sentence cites its source.

Connections

15 linked subjects · 26 links inferred · 20 named together

A link reads subject → relation → subject. Each is stated by a fact (quoted, with its source), taken from Wikidata, or worked out by the knowledge graph's reasoner from the links it was given; inferred links are marked ∴ with the rule behind them.

RS-25 and 10 of its closest connectionsSpace Shuttle · has part(s) · Space Shuttle external tankSpace Shuttle · has part(s) · Space Shuttle orbiterSpace Shuttle · source of · Artemis programSpace Shuttle · part of · Human spaceflightSpace Shuttle · part of · Space Shuttle programSpace Shuttle external tank · part of · Space Shuttle orbiterSpace Shuttle external tank · part of · Space Launch System core stageSpace Shuttle external tank · part of · Artemis IISpace Shuttle external tank · part of · Artemis programSpace Shuttle external tank · part of · Human spaceflightSpace Shuttle external tank · part of · Space Shuttle programSpace Shuttle external tank · part of · Artemis IVSpace Shuttle orbiter · part of · Human spaceflightSpace Shuttle orbiter · part of · Space Shuttle programSpace Launch System core stage · part of · Artemis IISpace Launch System core stage · part of · Artemis programSpace Launch System core stage · part of · Artemis IVArtemis II · part of · Artemis programArtemis II · named together · Artemis IVArtemis program · has part(s) · Artemis IVHuman spaceflight · has part(s) · Space Shuttle programSpace ShuttleSpace Shuttle ext…Space Shuttle or…Aerojet Rocketdy…Space Launch Syst…Artemis IIArtemis programHuman spaceflightSpace Shuttle pr…Artemis IV
Point at a subject to see how it links to RS-25.
  • stated
  • inferred
  • named together
  • Space Shuttle Object
    • (Space Shuttle → powered by → RS-25) The Space Shuttle Main Engines steered the entire Space Shuttle as well as providing rocket thrust towards orbit.5 and 3 more facts
    • (RS-25 → part of → Space Shuttle) Three Space Shuttle main engines were mounted at the aft end of the orbiter.6
    • (Space Shuttle → has part(s) → RS-25) Space Shuttle components included three clustered Rocketdyne RS-25 main engines on the orbiter.1
    • (RS-25 → powered by → Space Shuttle external tank) During lift-off and ascent, the Space Shuttle external tank supplied fuel and oxidizer under pressure to the three RS-25 main engines in the orbiter.9
    • (RS-25 → has part(s) → Space Shuttle external tank) inferred: implied by “powered by” (above)
    • (Space Shuttle external tank → part of → RS-25) inferred: the other reading of “has part(s)”
    • (Space Shuttle orbiter → powered by → RS-25) The orbiter carried most of the Space Shuttle's liquid-propellant rocket system, while its liquid hydrogen fuel and liquid oxygen oxidizer for its three main rocket engines came from an external cryogenic propellant tank.5 and 2 more facts
    • (RS-25 → recovered by → Space Shuttle orbiter) The Space Shuttle recovered and reused its solid rocket boosters, the orbiter and the RS-25 engines, but not its external fuel tank.10
    • (RS-25 → part of → Space Shuttle orbiter) inferred: through Orbital Maneuvering System, as “part of” carries over; stated: Two Orbital Maneuvering System thrusters were mounted in two separate removable pods on the orbiter's aft fuselage.5
    • (Space Shuttle orbiter → has part(s) → RS-25) inferred: implied by “powered by” (above)
  • Aerojet Rocketdyne Organization
    • (Aerojet Rocketdyne → product or material produced → RS-25) On May 1, 2020, NASA awarded Aerojet Rocketdyne a contract extension to manufacture 18 additional RS-25 engines for $1.79 billion.2
  • Space Launch System core stage Object
    • (Space Launch System core stage → powered by → RS-25) The four RS-25 main engines on the core stage ignited about seven seconds before liftoff.7
    • (RS-25 → part of → Space Launch System core stage) inferred: the other reading of “has part(s)”
    • (Space Launch System core stage → has part(s) → RS-25) inferred: implied by “powered by” (above)
  • Artemis II Object
    • (RS-25 → part of → Artemis II) inferred: through Space Launch System core stage, as “part of” carries over; stated: The Artemis II core stage made a destructive reentry over the Pacific Ocean about two hours after launch.7
    • (Artemis II → has part(s) → RS-25) inferred: the other reading of “part of”
  • Artemis program Concept
    • (RS-25 → part of → Artemis program) inferred: through Artemis II, as “part of” carries over; stated: Artemis II, the first crewed mission of the Artemis program, was planned to launch on April 1, 2026 on a free-return flyby of the Moon.11
    • (Artemis program → has part(s) → RS-25) inferred: through Artemis II, as “has part(s)” carries over; stated: As of 2026, the Artemis program has flown two successful missions, Artemis I and Artemis II.12
    • (RS-25 → part of → Human spaceflight) inferred: the other reading of “has part(s)”
    • (Human spaceflight → has part(s) → RS-25) inferred: the other reading of “part of”
    • (RS-25 → part of → Space Shuttle program) inferred: the other reading of “has part(s)”
    • (Space Shuttle program → has part(s) → RS-25) inferred: the other reading of “part of”
  • Artemis IV Event
    • (RS-25 → part of → Artemis IV) inferred: the other reading of “has part(s)”
    • (Artemis IV → has part(s) → RS-25) inferred: through Space Launch System core stage, as “has part(s)” carries over; stated: The core stage of Artemis IV will use RS-25 engines E2044, E2050, E2051, and E2063.13
  • Starship HLS Object
    • (RS-25 → part of → Starship HLS) inferred: through Artemis IV, as “part of” carries over; stated: The first crewed landing with the Starship Human Landing System has been moved to Artemis IV, targeted for 2028.14
    • (Starship HLS → has part(s) → RS-25) inferred: the other reading of “part of”
    • (RS-25 → part of → Human Landing System) inferred: the other reading of “has part(s)”
    • (Human Landing System → has part(s) → RS-25) inferred: the other reading of “part of”
Show 3 more connections
  • Intertank Concept
    • (RS-25 → has part(s) → Intertank) inferred: the other reading of “part of”
    • (Intertank → part of → RS-25) inferred: through Space Shuttle external tank, as “part of” carries over; stated: The intertank is the structural connection between the LOX and LH2 tanks of the Space Shuttle external tank.9
    • (RS-25 → has part(s) → Liquid hydrogen tank) inferred: the other reading of “part of”
    • (Liquid hydrogen tank → part of → RS-25) inferred: through Space Shuttle external tank, as “part of” carries over; stated: The liquid hydrogen tank forms the bottom portion of the external tank.9
  • Orbital Maneuvering System Object
    • (RS-25 → part of → Orbital Maneuvering System) inferred: through Space Shuttle orbiter, as “part of” carries over; stated: Space Shuttle orbiter thrusters were grouped in the nose and on each of the two aft Orbital Maneuvering System pods.15
    • (Orbital Maneuvering System → has part(s) → RS-25) inferred: the other reading of “part of”

Named together

Subjects that share a fact with RS-25, with no typed link between them yet.

  • Space Launch System 8 shared facts
    • For many Artemis missions, the Space Launch System's engines and boosters will be previously flown Space Shuttle main engines, solid rocket boosters and Orbital Maneuvering System engines.11
    • In the White FCR, BOOSTER was responsible for the Space Shuttle Solid Rocket Boosters and the RS-25 engines during ascent.16
  • NASA 2 shared facts
    • Toward the end of the program, NASA began again to consider using RS-25 engines instead of upgrading the RS-68 to be regeneratively-cooled, after it became apparent that the ablatively-cooled RS-68B engines would not withstand the heat from the solid rocket boosters at launch.17
  • Ares 2 shared facts
    • In The Case for Mars, the proposed Ares rocket would have used the Space Shuttle external tank powered by four Space Shuttle Main Engines and a second stage powered by an RL10 engine.18
  • Ares V 2 shared facts
    • NASA decided after its 2006 design review to switch the Ares V to the cheaper RS-68 engine instead of a modified RS-25.9
  • Space Shuttle Challenger 1 shared fact
    • Challenger was the first orbiter to feature Phase I main engines rated for 104% maximum thrust.19
  • Artemis I 1 shared fact
    • The core stage of Artemis I's Space Launch System used four RS-25D engines, all of which had previously flown on Space Shuttle missions.20
  • Artemis III 1 shared fact
    • The core stage for Artemis III is planned to use RS-25 engines that previously flew on Space Shuttle missions and were refurbished by Aerojet Rocketdyne.21
  • Space Shuttle Enterprise 1 shared fact
    • Space Shuttle Enterprise was constructed without engines or a functional heat shield.22
  • Ares I 1 shared fact
    • The Ares I was reconfigured to incorporate a fifth solid-rocket segment, because the J-2X upper stage has less thrust than the original RS-25.9
  • Doug Hurley 1 shared fact
    • Hurley said the Merlin Vacuum upper-stage engine was rougher than the Space Shuttle Main Engines, "kind of like driving fast on a dirt road".23
  • STS-1 1 shared fact
    • Ignition of the three RS-25 main engines was sensed as a sharp increase in noise.24
  • SpaceX Raptor 1 shared fact
    • The Raptor's gimbaling range is 15°, higher than the RS-25's 12.5° and the Merlin's 5°.14
  • Rocketdyne 3 shared facts
    • The beginning of development of the RS-25 Space Shuttle Main Engine was delayed for nine months while Pratt & Whitney challenged the contract that had been issued to Rocketdyne.1
  • Liquid oxygen 2 shared facts
    • The RS-25 engines used liquid hydrogen and liquid oxygen from the external tank, because the orbiter had no room for internal fuel tanks.4
  • Liquid hydrogen 2 shared facts
    • The RS-25 engines used liquid hydrogen and liquid oxygen from the external tank, because the orbiter had no room for internal fuel tanks.4

Also named with RS-25: Pratt & Whitney, RS-68, DIRECT & Jupiter Rocket Family, Space Shuttle Main Propulsion Test Article.

RS-25: facts

22 facts in 5 categories · rated most surprising

What it is (1 fact)

  • The Space Shuttle's three RS-25 engines were also known as the Space Shuttle Main Engines (SSME).1

Making and creation (3 facts)

  • The final two RS-25D engines needed for the Space Launch System were assembled from existing RS-25D spare parts.2
  • The first RS-25 engine was completed in March 1975, after issues with developing the first throttleable, reusable engine.1
  • Aerojet Rocketdyne refurbished the RS-25D engines for the Space Launch System with modernized controllers, expanded throttle capability, and additional insulation for the higher thermal environment near the solid rocket boosters.2

Events (4 facts)

  • The beginning of development of the RS-25 Space Shuttle Main Engine was delayed for nine months while Pratt & Whitney challenged the contract that had been issued to Rocketdyne.1
  • The first test firing of an RS-25E engine occurred in June 2025 and was declared successful.2
  • During engine testing, the RS-25 experienced multiple nozzle failures as well as broken turbine blades.1
  • The Space Shuttle main engines were throttled down as scheduled for maximum dynamic pressure.3

By the numbers (2 facts)

  • Thrust for the refurbished RS-25D engines was increased from 492,000 to 513,000 lbf (2,188 to 2,281 kN).2
  • The RS-25E is rated at 522,000 lbf (2,321 kN) of thrust per engine.2

Details and parts (12 facts)

  • The RS-25 is a staged-combustion cycle cryogenic engine that used liquid oxygen and hydrogen and had a higher chamber pressure than any previous liquid-fueled rocket.1
  • The RS-25 engines used liquid hydrogen and liquid oxygen from the external tank, because the orbiter had no room for internal fuel tanks.4
  • The three Space Shuttle Main Engines could be swiveled 10.5 degrees vertically and 8.5 degrees horizontally during ascent to change the direction of their thrust.5
  • The Space Shuttle Main Engines steered the entire Space Shuttle as well as providing rocket thrust towards orbit.5
  • During development, Rocketdyne determined that the RS-25 engine was capable of safe reliable operation at 104% of the originally specified thrust.1
  • The Block II RS-25 engines achieved a 109% thrust level in 2001.1
  • The RS-25 normal maximum throttle was 104 percent, with 106% or 109% used for mission aborts.1
  • Three Space Shuttle main engines were mounted at the aft end of the orbiter.6
4 more facts in details and parts
  • Three Space Shuttle main engines were mounted at the aft end of the orbiter and provided thrust during launch.3
  • The four RS-25 main engines on the core stage ignited about seven seconds before liftoff.7
  • The Space Shuttle orbiter had 3 RS-25 engines that used a liquid oxygen and liquid hydrogen propellant combination.8
  • Spare RS-25 nozzles were attached to the removed engines for display purposes.1

Mentioned on other pages

41 facts about other subjects name RS-25; the 24 most surprising

  • NASA: Toward the end of the program, NASA began again to consider using RS-25 engines instead of upgrading the RS-68 to be regeneratively-cooled, after it became apparent that the ablatively-cooled RS-68B engines would not withstand the heat from the solid rocket boosters at launch.17
  • Doug Hurley: Hurley said the Merlin Vacuum upper-stage engine was rougher than the Space Shuttle Main Engines, "kind of like driving fast on a dirt road".23
  • Space Shuttle Enterprise: Space Shuttle Enterprise was constructed without engines or a functional heat shield.22
  • Artemis III: The core stage for Artemis III is planned to use RS-25 engines that previously flew on Space Shuttle missions and were refurbished by Aerojet Rocketdyne.21
  • Space Launch System: For many Artemis missions, the Space Launch System's engines and boosters will be previously flown Space Shuttle main engines, solid rocket boosters and Orbital Maneuvering System engines.11
  • Ares V: NASA decided after its 2006 design review to switch the Ares V to the cheaper RS-68 engine instead of a modified RS-25.9
  • Space Launch System: The initial Space Launch System flights will use modified RS-25D engines left over from the Space Shuttle program.9
  • Artemis II: After a leak was discovered in the oxygen-valve hydraulics, engine E2063 on the Artemis II core stage was replaced with E2061 in April 2025.7
  • Space Shuttle orbiter: The Space Shuttle recovered and reused its solid rocket boosters, the orbiter and the RS-25 engines, but not its external fuel tank.10
  • Space Launch System: The first four Space Launch System missions will each use four of the remaining fourteen RS-25D engines left over from the Space Shuttle program.2
  • Space Launch System: Later Space Launch System flights will transition to the RS-25E, which is optimized for expendable use, is faster to build, and costs 30% less.2
  • Aerojet Rocketdyne: On May 1, 2020, NASA awarded Aerojet Rocketdyne a contract extension to manufacture 18 additional RS-25 engines for $1.79 billion.2
  • Space Launch System: The first Space Launch System launch was postponed from August 29, 2022 to September 3, 2022 after the launch director called a scrub over a temperature sensor falsely indicating that an RS-25 engine's hydrogen bleed intake was too warm.2
  • Artemis I: The core stage of Artemis I's Space Launch System used four RS-25D engines, all of which had previously flown on Space Shuttle missions.20
  • Space Shuttle Solid Rocket Booster: In the White FCR, BOOSTER was responsible for the Space Shuttle Solid Rocket Boosters and the RS-25 engines during ascent.16
  • Space Shuttle Challenger: Challenger was the first orbiter to feature Phase I main engines rated for 104% maximum thrust.19
  • SpaceX Raptor: The Raptor's gimbaling range is 15°, higher than the RS-25's 12.5° and the Merlin's 5°.14
  • Ares V: Five RS-25 engines were originally planned for the Ares V, but the RS-68 engines were chosen because they are more powerful and less complex and therefore less expensive than the SSMEs.17
  • Ares: In The Case for Mars, the proposed Ares rocket would have used the Space Shuttle external tank powered by four Space Shuttle Main Engines and a second stage powered by an RL10 engine.18
  • Ares: In Zubrin's Ares design, the Space Shuttle Main Engines were on a small side-mounted flyback craft.18
  • RS-68: NASA estimated it would save US$35 million by using simplified, higher-thrust RS-68 engines instead of an air-startable RS-25 for the Ares V.9
  • Ares I: The Ares I was reconfigured to incorporate a fifth solid-rocket segment, because the J-2X upper stage has less thrust than the original RS-25.9
  • DIRECT & Jupiter Rocket Family: The DIRECT project was a proposed alternative shuttle-derived vehicle that would have used three RS-25 engines and two SRBs as a Crew Launch Vehicle.9
  • Space Launch System: Later Space Launch System flights will switch to a cheaper version of the RS-25 engine that is not intended for reuse.9

Sources

24 pages the facts on this page were read from

  1. Space Shuttle en.wikipedia.org
  2. Space Launch System en.wikipedia.org
  3. Space Shuttle Challenger disaster en.wikipedia.org
  4. Kennedy Space Center Launch Complex 39 en.wikipedia.org
  5. Space Shuttle orbiter en.wikipedia.org
  6. Space Shuttle Columbia disaster en.wikipedia.org
  7. Artemis II en.wikipedia.org
  8. Spacecraft en.wikipedia.org
  9. Space Shuttle external tank en.wikipedia.org
  10. Launch vehicle en.wikipedia.org
  11. Space Shuttle program en.wikipedia.org
  12. Artemis program en.wikipedia.org
  13. Artemis IV en.wikipedia.org
  14. SpaceX Starship en.wikipedia.org
  15. Reaction control system en.wikipedia.org
  16. Christopher C. Kraft Jr. Mission Control Center en.wikipedia.org
  17. Constellation program en.wikipedia.org
  18. Ares V en.wikipedia.org
  19. Space Shuttle Challenger en.wikipedia.org
  20. Artemis I en.wikipedia.org
  21. Artemis III en.wikipedia.org
  22. Space Shuttle Enterprise en.wikipedia.org
  23. Crew Dragon Demo-2 en.wikipedia.org
  24. STS-1 en.wikipedia.org

Facts are short sentences the Trivia Zone knowledge graph read from these pages; Wikipedia text is available under CC BY-SA 4.0 and Wikidata under CC0. Names, classes and links come from Wikidata.