Gemini 5
Human spaceflight
Gemini 5 was the first NASA mission to have an insignia patch.1 The Gemini 5 landing error came from a programmer entering the Earth's rotation rate as 360° per 24 hours instead of 360.98°, although the computer itself worked perfectly.1 Gemini 5's record duration might have been one day longer, but the mission was cut short because of the approach of Hurricane Betsy.1
A summary made of Gemini 5's own facts, quoted as read; each sentence cites its source.
Connections
21 linked subjects · 19 links inferred · 18 named together
A link reads subject → relation → subject. Each is stated by a fact (quoted, with its source), taken from Wikidata, or worked out by the knowledge graph's reasoner from the links it was given; inferred links are marked ∴ with the rule behind them.
- stated
- inferred
- named together
- Neil Armstrong Person
- (Gemini 5 → backup or reserve team or crew → Neil Armstrong) On February 8, 1965, Neil Armstrong and Elliot See were picked as the backup crew for Gemini 5, with Armstrong as commander.2
- Houston Place
- (Gemini 5 → located in → Houston) The Gemini 5 spacecraft is on display at Space Center Houston in Houston, Texas.1
- NASA Organization
- (Gemini 5 → operator → NASA) Gemini 5 was a 1965 crewed spaceflight in NASA's Project Gemini.1
- (Gemini 5 → used by → NASA) inferred: implied by “operator” (above)
- (NASA → item operated → Gemini 5) inferred: the other reading of “operator” (above)
- Fuel cell Object
- (Gemini 5 → powered by → Fuel cell) Gemini 5 used new fuel cells that generated enough electricity for longer missions, instead of the chemical batteries used on previous crewed spacecraft.1 and 1 more fact
- (Gemini 5 → has part(s) → Fuel cell) inferred: implied by “powered by” (above)
- (Fuel cell → part of → Gemini 5) inferred: the other reading of “has part(s)”
- Project Gemini Concept
- (Gemini 5 → part of → Project Gemini) Gemini 5 was a 1965 crewed spaceflight in NASA's Project Gemini.1 and 1 more fact
- (Project Gemini → has part(s) → Gemini 5) from Wikidata
- Gordon Cooper Person
- (Gordon Cooper → member of the crew of → Gemini 5) Gordon Cooper became the first astronaut to make a second orbital flight in 1965 as command pilot of Gemini 5.5 and 2 more facts
- (Gemini 5 → designed by → Gordon Cooper) Gemini 5's insignia patch was suggested by Cooper, who had never been in a military organization without one.1 and 1 more fact
- (Gemini 5 → crew members → Gordon Cooper) from Wikidata
- (Gemini 5 → creator → Gordon Cooper) inferred: implied by “designed by” (above)
- (Gordon Cooper → affiliation → Gemini 5) inferred: implied by “member of the crew of” (above)
- (Gordon Cooper → member of → Gemini 5) inferred: implied by “member of the crew of” (above)
- Gemini 4 Object
- (Gemini 5 → defeated → Gemini 4) Gemini 5 doubled the U.S. space-flight record of the Gemini 4 mission to eight days.1
- (Gemini 5 → follows → Gemini 4) from Wikidata
- (Gemini 4 → followed by → Gemini 5) from Wikidata
- (Gemini 4 → was defeated by → Gemini 5) inferred: the other reading of “defeated” (above)
- Space rendezvous Concept
- (Gemini 5 → has goal → Space rendezvous) The Gemini 5 mission was meant to practice space rendezvous and to develop procedures and equipment for a seven-day flight needed for a Moon mission.2
- Charles Conrad Concept
- (Charles Conrad → member of the crew of → Gemini 5) Charles "Pete" Conrad flew on Gemini 5 in 1965 and was command pilot of Gemini 11 in 1966.6
- (Gemini 5 → crew members → Charles Conrad) inferred: the other reading of “member of the crew of” (above)
- (Charles Conrad → affiliation → Gemini 5) inferred: implied by “member of the crew of” (above)
- (Charles Conrad → member of → Gemini 5) inferred: implied by “member of the crew of” (above)
- Atlantic Ocean Place
- (Gemini 5 → located in → Atlantic Ocean) Due to a computing error, Gemini 5 landed 80 miles (130 kilometers) short of the planned landing point in the Atlantic Ocean.1
- (Gemini 5 → location of landing → Atlantic Ocean) from Wikidata
- (Gemini 5 → location → Atlantic Ocean) inferred: implied by “location of landing” (from Wikidata)
- Zagros Mountains Place
- (Gemini 5 → depicts → Zagros Mountains) A Gemini 5 photograph of the Zagros Mountains revealed greater detail than the official geologic map of Iran.1
- (Zagros Mountains → depicted by → Gemini 5) inferred: the other reading of “depicts” (above)
- Vostok 5 Object
- (Gemini 5 → defeated → Vostok 5) On August 26, 1965, Gemini 5 gave the United States its first crewed mission to hold the world spaceflight duration record, breaking the Soviet Union's record set by Vostok 5 in 1963.1
- (Vostok 5 → was defeated by → Gemini 5) inferred: the other reading of “defeated” (above)
Show 9 more connections
- Space Center Houston Place
- (Gemini 5 → located in → Space Center Houston) The Gemini 5 spacecraft is on display at Space Center Houston in Houston, Texas.1
- Low Earth orbit Concept
- (Gemini 5 → type of orbit → Low Earth orbit) from Wikidata
- Pete Conrad Person
- (Gemini 5 → crew members → Pete Conrad) from Wikidata
- (Pete Conrad → affiliation → Gemini 5) inferred: implied by “member of”
- (Pete Conrad → member of → Gemini 5) inferred: implied by “member of the crew of”
- (Pete Conrad → member of the crew of → Gemini 5) inferred: the other reading of “crew members” (from Wikidata)
- Gemini 7 Object
- (Gemini 5 → followed by → Gemini 7) from Wikidata
- (Gemini 7 → follows → Gemini 5) inferred: the other reading of “followed by” (from Wikidata)
- Elliot See Person
- (Gemini 5 → backup or reserve team or crew → Elliot See) from Wikidata
- USS Lake Champlain Object
- (Gemini 5 → recovered by → USS Lake Champlain) from Wikidata
- Titan II GLV Object
- (Gemini 5 → space launch vehicle → Titan II GLV) from Wikidata
- Splashdown Event
- (Gemini 5 → significant event → Splashdown) from Wikidata
- Cape Canaveral Launch Complex 19 Concept
- (Gemini 5 → start point → Cape Canaveral Launch Complex 19) from Wikidata
- (Gemini 5 → location → Cape Canaveral Launch Complex 19) inferred: implied by “start point” (from Wikidata)
Named together
Subjects that share a fact with Gemini 5, with no typed link between them yet.
- United States Department of Defense 2 shared facts
- Gemini 5 astronauts Cooper and Conrad took high-resolution photographs for the United States Department of Defense.1
- David Scott 2 shared facts
- David Scott served as backup CAPCOM during Gemini 4 and as CAPCOM during Gemini 5.7
- Gemini 3 2 shared facts
- The Gemini 3 insignia was not worn by the flight crew as a patch, unlike the patches worn from Gemini 5 onwards.8
- Buzz Aldrin 1 shared fact
- Buzz Aldrin had a doctorate in orbital mechanics and devised a scheme for the Gemini 5 crew to rendezvous with a given point in space.1
- Apollo program 1 shared fact
- Gemini 5 demonstrated the 8-day endurance needed for an Apollo lunar mission.4
- Pogo oscillation 2 shared facts
- During the Gemini 5 launch, pogo oscillation was measured at +0.38 g during first stage flight, exceeding the permitted +0.25 g for about 13 seconds.1
- Conrad 2 shared facts
- Conrad wore inflatable leg cuffs during an experiment into the performance of the heart.1
- Iran 1 shared fact
- A Gemini 5 photograph of the Zagros Mountains revealed greater detail than the official geologic map of Iran.1
- Hawaii 1 shared fact
- Retrofire for Gemini 5 was initiated over Hawaii at 190 hours, 27 minutes and 43 seconds into the mission.1
- Volkswagen Beetle 1 shared fact
- Conrad called the Gemini 5 mission 'Eight days in a garbage can,' referring to the small cabin, which was about the size of the front seat of a Volkswagen Beetle.1
- Sidereal time 1 shared fact
- The Gemini 5 landing error came from a programmer entering the Earth's rotation rate as 360° per 24 hours instead of 360.98°, although the computer itself worked perfectly.1
- Hasselblad 1 shared fact
- The Gemini 5 crew used their Hasselblad camera to photograph meteorological phenomena such as cloud formations.1
- Desiccant 1 shared fact
- The light flashes seen in Gemini 5 launch film were thought to be caused by duct tape securing desiccant bags to the turbine exhaust pipe.1
- Conestoga wagon 1 shared fact
- Cooper chose the image of a covered wagon for the Gemini 5 patch due to the pioneering nature of the flight.1
- Hurricane Betsy 1 shared fact
- Gemini 5's record duration might have been one day longer, but the mission was cut short because of the approach of Hurricane Betsy.1
- Orbit Attitude and Maneuvering System 1 shared fact
- Gemini 5 tried four maneuvers using the orbit attitude and maneuvering system: apogee adjust, phase adjust, plane change, and coelliptical maneuver.1
Also named with Gemini 5: OAMS, Smithsonian.
Gemini 5: facts
55 facts in 12 categories · rated most surprising
What it is (1 fact)
- Gemini 5 was the first NASA mission to have an insignia patch.1
Life and career (1 fact)
- Postflight medical examinations of the Gemini 5 crew showed some loss of red blood cells and plasma.1
Making and creation (4 facts)
- Conrad wore inflatable leg cuffs during an experiment into the performance of the heart.1
- The Cloud-Top Spectrometer experiment on Gemini 5 revealed that the height of clouds could be determined from orbit.1
- Gemini 5's insignia patch was suggested by Cooper, who had never been in a military organization without one.1
- The Gemini 5 crew used their Hasselblad camera to photograph meteorological phenomena such as cloud formations.1
Events (27 facts)
- On August 26, 1965, Gemini 5 gave the United States its first crewed mission to hold the world spaceflight duration record, breaking the Soviet Union's record set by Vostok 5 in 1963.1
- Gemini 5's record duration might have been one day longer, but the mission was cut short because of the approach of Hurricane Betsy.1
- Cooper and Conrad were to have made a practice space rendezvous with a pod deployed from Gemini 5, but electrical supply problems forced a switch to a simpler phantom rendezvous.1
- Film of the Gemini 5 launch revealed unexplained light flashes in the first stage exhaust plume, but telemetry failed to show anything that could have caused them.1
- On the third day of Gemini 5 the phantom rendezvous went perfectly, despite being the first precision maneuver on a spaceflight.1
- Due to a computing error, Gemini 5 landed 80 miles (130 kilometers) short of the planned landing point in the Atlantic Ocean.1
- NASA managers objected to the "8 Days or Bust" slogan because it placed too much emphasis on mission length rather than experiments.1
- The Gemini 5 mission was generally successful, despite a fuel cell problem that prevented a rendezvous.2
19 more facts in events
- Gemini 5 demonstrated eight-day endurance, long enough for a round trip to the Moon.3
- Problems with the fuel cells and maneuvering system forced the cancellation of several other Gemini 5 experiments.1
- During the Gemini 5 launch, pogo oscillation was measured at +0.38 g during first stage flight, exceeding the permitted +0.25 g for about 13 seconds.1
- The pogo oscillation during the Gemini 5 launch was traced to improper gas levels in an oxidizer standpipe.1
- The cause of the Gemini 5 fuel cell mishap was believed to be a short circuit in the oxygen tank heater that tripped a breaker.1
- During the Gemini 5 mission, one of the OAMS thruster blocks, made up of thrusters 5, 6, 7 and 8, malfunctioned repeatedly.1
- NASA managers feared the public might see Gemini 5 as a failure if it did not last its full duration.1
- The Gemini 5 mission was meant to practice space rendezvous and to develop procedures and equipment for a seven-day flight needed for a Moon mission.2
- Gemini 5 was to be the first Agena rendezvous mission.4
- Gemini 5 demonstrated the 8-day endurance needed for an Apollo lunar mission.4
- Gemini 5 was a 1965 crewed spaceflight in NASA's Project Gemini.1
- Gemini 5 carried a rendezvous evaluation pod that was released into orbit on August 21, 1965.1
- Gemini 5 astronauts Cooper and Conrad took high-resolution photographs for the United States Department of Defense.1
- The Gemini 5 crew shivered from cold as they drifted, even with suit coolant turned off and airflow on low.1
- Gemini 5 tried four maneuvers using the orbit attitude and maneuvering system: apogee adjust, phase adjust, plane change, and coelliptical maneuver.1
- The malfunction of the thruster block caused cancellation of all experiments requiring the use of the thrusters.1
- Retrofire for Gemini 5 was initiated over Hawaii at 190 hours, 27 minutes and 43 seconds into the mission.1
- The Gemini 5 crew was recovered by the aircraft carrier USS Lake Champlain.1
- Gemini 5 was postponed because six crews were competing for simulator time while Gemini 3 and Gemini 4 were in preparation.2
Traits (1 fact)
- The astronauts on Gemini 5 averaged about 1000 calories a day, well below the intended 2700 calorie daily food intake.1
Places (2 facts)
By the numbers (4 facts)
- Gemini 5 doubled the U.S. space-flight record of the Gemini 4 mission to eight days.1
- The Gemini 5 initial orbit was 101 × 216 miles (163 × 349 kilometers).1
- Seventeen experiments were planned for the Gemini 5 mission, with one cancelled because it involved photography of the REP.1
- The Gemini 5 mission was supported by 10,265 U.S. Department of Defense personnel, 114 aircraft and 19 ships.1
Details and parts (7 facts)
- Gemini 5 used new fuel cells that generated enough electricity for longer missions, instead of the chemical batteries used on previous crewed spacecraft.1
- The light flashes seen in Gemini 5 launch film were thought to be caused by duct tape securing desiccant bags to the turbine exhaust pipe.1
- A piece of nylon cloth was sewn over the official "8 Days or Bust" slogan on the Gemini 5 patch.1
- The Gemini 5 astronauts controlled reentry by creating drag and lift through rotating the capsule.1
- Gemini 5 was the first spacecraft to use fuel cells to generate its electrical power, in the Gemini program.4
- Severe oscillations did not affect any subsequent Gemini flights.1
- Gemini 5 fuel cells produced waste water too acidic to drink, in 20% higher quantity than expected.1
Look and appearances (2 facts)
Reception and legacy (1 fact)
- A Gemini 5 photograph of the Zagros Mountains revealed greater detail than the official geologic map of Iran.1
In their words (1 fact)
- Conrad called the Gemini 5 mission 'Eight days in a garbage can,' referring to the small cabin, which was about the size of the front seat of a Volkswagen Beetle.1
Trivia (4 facts)
- The Gemini 5 landing error came from a programmer entering the Earth's rotation rate as 360° per 24 hours instead of 360.98°, although the computer itself worked perfectly.1
- The astronauts on Gemini 5 reported dandruff as a persistent problem, with loose skin flakes settling on the instrument panel and partially obscuring some instrument readouts.1
- Gemini 5's eight-day flight was the length of time it would take to fly to the Moon, land and return.1
- Gemini 5 fuel cells produced drinking water with a high quantity of gas bubbles, according to the astronauts.1
Mentioned on other pages
16 facts about other subjects name Gemini 5
- Gordon Cooper: Gordon Cooper became the first astronaut to make a second orbital flight in 1965 as command pilot of Gemini 5.5
- Gordon Cooper: During Gemini 5 a fuel cell pressure dropped from 850 to 65 pounds per square inch while the crew was out of radio contact, and Cooper decided to shut the fuel cells down.1
- Buzz Aldrin: Buzz Aldrin had a doctorate in orbital mechanics and devised a scheme for the Gemini 5 crew to rendezvous with a given point in space.1
- Gordon Cooper: On Gemini 5, Gordon Cooper took the first photographs of the zodiacal light and the gegenschein from orbit.1
- Gordon Cooper: During Gemini 5, Gordon Cooper and Pete Conrad practiced a "phantom rendezvous", carrying out the maneuver without a target.2
- Fuel cell: The fuel cells used on Gemini 5 were a pivotal innovation for future Apollo flights.1
- Pete Conrad: Astronauts Conrad and Cooper found their vision and speech momentarily impaired by the strong vibrations during the Gemini 5 launch.1
- Conrad: Conrad's circulatory system returned to normal values within two days after the Gemini 5 mission, while Cooper took over four days.1
- Neil Armstrong: On February 8, 1965, Neil Armstrong and Elliot See were picked as the backup crew for Gemini 5, with Armstrong as commander.2
- Gordon Cooper: Gordon Cooper beat the endurance record again during Gemini 5.9
- Charles Conrad: Charles "Pete" Conrad flew on Gemini 5 in 1965 and was command pilot of Gemini 11 in 1966.6
- David Scott: David Scott served as backup CAPCOM during Gemini 4 and as CAPCOM during Gemini 5.7
- David Scott: Deke Slayton, Director of Flight Crew Operations, informed David Scott after the conclusion of Gemini 5 that he would fly with Neil Armstrong on Gemini 8.7
- Gordon Cooper: Gordon Cooper, a Mercury veteran, was command pilot of Gemini 5.1
- Gemini 3: The Gemini 3 insignia was not worn by the flight crew as a patch, unlike the patches worn from Gemini 5 onwards.8
- Project Gemini: In late 1963, Slayton selected Shepard and Stafford for Gemini 3, McDivitt and White for Gemini 4, and Schirra and Young for Gemini 5.4
Sources
9 pages the facts on this page were read from
- Gemini 5 en.wikipedia.org
- Neil Armstrong en.wikipedia.org
- Space Race en.wikipedia.org
- Project Gemini en.wikipedia.org
- Mercury Seven en.wikipedia.org
- Apollo 12 en.wikipedia.org
- David Scott en.wikipedia.org
- Gemini 3 en.wikipedia.org
- Project Mercury en.wikipedia.org
Facts are short sentences the Trivia Zone knowledge graph read from these pages; Wikipedia text is available under CC BY-SA 4.0 and Wikidata under CC0. Names, classes and links come from Wikidata.