Raffaello MPLM
Large pressurized container for cargo resupply of the International Space Station
The securing of Raffaello in Atlantis's payload bay marked the tenth and final transfer of an MPLM in the history of the Space Shuttle program.1 Raffaello was loaded with almost 5,700 pounds (2,600 kg) of unneeded equipment and station waste to be brought back to Earth.1 The Multi-Purpose Logistics Module Raffaello was filled with 16 resupply racks, the maximum it could handle.1
A summary made of Raffaello MPLM's own facts, quoted as read; each sentence cites its source.
Connections
1 linked subject · 1 link inferred · 7 named together
A link reads subject → relation → subject. Each is stated by a fact (quoted, with its source), taken from Wikidata, or worked out by the knowledge graph's reasoner from the links it was given; inferred links are marked ∴ with the rule behind them.
- stated
- inferred
- named together
- Multi-Purpose Logistics Module Object
- (Raffaello MPLM → instance of → Multi-Purpose Logistics Module) The Multi-Purpose Logistics Module Raffaello was filled with 16 resupply racks, the maximum it could handle.1
- (Multi-Purpose Logistics Module → has instance → Raffaello MPLM) inferred: the other reading of “instance of” (above)
Named together
Subjects that share a fact with Raffaello MPLM, with no typed link between them yet.
- STS-135 6 shared facts
- The primary cargo of STS-135 was the Multi-Purpose Logistics Module Raffaello and a Lightweight Multi-Purpose Carrier, delivered to the International Space Station.1
- Space Shuttle Atlantis 3 shared facts
- The flight of Raffaello marked the only time that Space Shuttle Atlantis carried a Multi-Purpose Logistics Module.1
- International Space Station 1 shared fact
- Raffaello's trip on STS-135 was its fourth to the International Space Station since 2001.1
- Sandra Magnus 1 shared fact
- Mission Specialist Sandra Magnus and Pilot Doug Hurley used the Canadarm2 to remove the Raffaello module from the payload bay of Atlantis.1
- Space Shuttle program 1 shared fact
- The securing of Raffaello in Atlantis's payload bay marked the tenth and final transfer of an MPLM in the history of the Space Shuttle program.1
- Pressurized Mating Adapter 1 shared fact
- Crew members opened the Pressurized Mating Adapter PMA-3, attached to the Tranquility node, and stored some material from Raffaello there.1
- Chris Edelen 1 shared fact
- Chris Edelen, the Space Station lead Flight Director, called the closing out of the Raffaello logistics module a key milestone.1
Raffaello MPLM: facts
6 facts in 3 categories · rated most surprising
Events (1 fact)
- Raffaello's trip on STS-135 was its fourth to the International Space Station since 2001.1
By the numbers (1 fact)
- The securing of Raffaello in Atlantis's payload bay marked the tenth and final transfer of an MPLM in the history of the Space Shuttle program.1
Details and parts (4 facts)
- The Multi-Purpose Logistics Module Raffaello was filled with 16 resupply racks, the maximum it could handle.1
- Raffaello was loaded with almost 5,700 pounds (2,600 kg) of unneeded equipment and station waste to be brought back to Earth.1
- The Multi-Purpose Logistics Module Raffaello made up the majority of the STS-135 payload.1
- The Raffaello MPLM was launched with 9,403 pounds of cargo and was expected to return 5,666 pounds when Atlantis landed.1
Mentioned on other pages
9 facts about other subjects name Raffaello MPLM
- Space Shuttle Atlantis: The flight of Raffaello marked the only time that Space Shuttle Atlantis carried a Multi-Purpose Logistics Module.1
- STS-135: The primary cargo of STS-135 was the Multi-Purpose Logistics Module Raffaello and a Lightweight Multi-Purpose Carrier, delivered to the International Space Station.1
- STS-135: On Flight Day 4 of STS-135, the main objective was to install the Raffaello MPLM on the nadir port of the International Space Station's Harmony module.1
- Sandra Magnus: Mission Specialist Sandra Magnus and Pilot Doug Hurley used the Canadarm2 to remove the Raffaello module from the payload bay of Atlantis.1
- Pressurized Mating Adapter: Crew members opened the Pressurized Mating Adapter PMA-3, attached to the Tranquility node, and stored some material from Raffaello there.1
- STS-135: On Flight Day 10 of STS-135, the crew of Atlantis finished the transfer work inside the Raffaello MPLM.1
- STS-135: STS-135 delivered 9,403 pounds (4,265 kg) of cargo up to the space station in the MPLM.1
- Chris Edelen: Chris Edelen, the Space Station lead Flight Director, called the closing out of the Raffaello logistics module a key milestone.1
- STS-135: The STS-135 crew moved the Raffaello MPLM from the International Space Station back to Atlantis's payload bay on flight day 11.1
Sources
1 page the facts on this page were read from
- STS-135 en.wikipedia.org
Facts are short sentences the Trivia Zone knowledge graph read from these pages; Wikipedia text is available under CC BY-SA 4.0 and Wikidata under CC0. Names, classes and links come from Wikidata.