Grumman

American aerospace company (1929–1994)

  • Business
  • 11 facts
  • 16 sources
  • Updated
  • Summary from facts

Grumman was awarded the Lunar Module contract officially on November 7, 1962.1 Grumman issued a joking invoice to North American Rockwell for 'towing' the CSM most of the way to the Moon and back.2 Grumman built a plywood mockup of the lunar module at Launch Complex 37 to aid in facilities verification.3

A summary made of Grumman's own facts, quoted as read; each sentence cites its source.

Connections

4 linked subjects · 6 links inferred · 18 named together

A link reads subject → relation → subject. Each is stated by a fact (quoted, with its source), taken from Wikidata, or worked out by the knowledge graph's reasoner from the links it was given; inferred links are marked ∴ with the rule behind them.

Grumman and 10 of its closest connectionsNASA · has contractor · Northrop GrummanNASA · item operated · Apollo Lunar ModuleNASA · named together · Rockwell InternationalNASA · named together · George LowNASA · item operated · SkylabNASA · item operated · Apollo 8NASA · item operated · Apollo 10NASA · item operated · Apollo 5Northrop Grumman · product or material produced · Apollo Lunar ModuleApollo Lunar Module · named together · George LowApollo Lunar Module · named together · Apollo 8Apollo Lunar Module · part of · Apollo 10Apollo Lunar Module · vessel · Apollo 5George Low · named together · Apollo 8George Low · named together · Apollo 5Apollo 8 · named together · Apollo 10NASANorthrop GrummanApollo Lunar Mod…Leroy GrummanRockwell Internat…George LowSkylabApollo 8Apollo 10Apollo 5
Point at a subject to see how it links to Grumman.
  • stated
  • inferred
  • named together
  • NASA Organization
    • (Grumman → contractor for → NASA) NASA asked Grumman to deliver LM-1 to Kennedy Space Center by September 1966, anticipating six months for checkout and testing.3 and 1 more fact
    • (NASA → has contractor → Grumman) inferred: the other reading of “contractor for” (above)
  • Northrop Grumman Organization
    • (Grumman → merged into → Northrop Grumman) Northrop Grumman was formed in 1994 through the merger of Northrop Corporation and Grumman Aerospace.4
    • (Northrop Grumman → replaces → Grumman) from Wikidata
    • (Grumman → followed by → Northrop Grumman) inferred: the other reading of “follows”
    • (Grumman → replaced by → Northrop Grumman) inferred: the other reading of “replaces” (from Wikidata)
    • (Northrop Grumman → follows → Grumman) inferred: implied by “replaces” (from Wikidata)
    • (Apollo Lunar Module → designed by → Grumman) The contract for design and construction of the Apollo Lunar Module was awarded to Grumman Aircraft Engineering Corporation.8 and 2 more facts
    • (Grumman → product or material produced → Apollo Lunar Module) Grumman made the Apollo Lunar Module.4
    • (Apollo Lunar Module → creator → Grumman) inferred: implied by “designed by” (above)
  • Leroy Grumman Person
    • (Grumman → founder → Leroy Grumman) Leroy R. Grumman established the Grumman Aircraft Engineering Corporation in December 1929 on Long Island, New York.4
    • (Grumman → creator → Leroy Grumman) inferred: implied by “founder” (above)

Named together

Subjects that share a fact with Grumman, with no typed link between them yet.

  • Rockwell International 3 shared facts
    • Grumman issued a joking invoice to North American Rockwell for 'towing' the CSM most of the way to the Moon and back.2
  • George Low 2 shared facts
    • George Low decided that the next LM flight would be crewed, although Grumman wanted a second uncrewed test.8
  • Skylab 1 shared fact
    • On April 1, 1966, MSC sent contracts to Douglas, Grumman, and McDonnell for converting a spent S-IVB stage under the name Saturn S-IVB spent-stage experiment support module.9
  • Apollo 8 1 shared fact
    • Grumman Aircraft Engineering Corporation, the lead Lunar Module contractor, predicted the first man-rated Lunar Module for the D mission would not be ready until at least February 1969, delaying the entire sequence.7
  • Apollo 10 1 shared fact
    • The Apollo 10 astronauts tested the Lunar Module at Grumman in Bethpage, New York.10
  • Apollo 5 1 shared fact
    • Apollo 5 was long delayed, partly because of setbacks in developing the Apollo Lunar Module, which was manufactured by Grumman Aircraft.3
  • Apollo 9 1 shared fact
    • The Apollo 9 lunar module was originally going to be LM-2, but the crew found numerous flaws in it, many tied to it being the first flight-ready lunar module off Grumman's production line.11
    • Block II would be the lunar-capable version, including a docking hatch, and the detailed design of its docking capability depended on the design of the LEM, which was contracted to Grumman Aircraft Engineering.12
  • Space Shuttle orbiter 1 shared fact
    • Grumman in Bethpage, New York built the wings of the Space Shuttle orbiter.6
    • Grumman built a plywood mockup of the lunar module at Launch Complex 37 to aid in facilities verification.3
    • NASA and the main contractors Boeing, Grumman, North American Aviation and Rockwell hoped to put off the inevitable scaling down of staff and facilities after the first Moon landing.13
  • Lunar module 1 shared fact
    • During testing, the Lunar Module's rendezvous radar assembly was found to have received too much voltage during earlier tests and was replaced by its manufacturer, Grumman.14
  • University of Toronto 1 shared fact
    • Engineers at Grumman, manufacturer of the lunar module, assigned a team of University of Toronto engineers led by senior scientist Bernard Etkin to solve how much air pressure to leave in the docking tunnel to push the modules apart.2
  • Northrop Corporation 1 shared fact
    • Northrop acquired Grumman Aerospace after the end of the Cold War.4
  • Bethpage, New York 1 shared fact
    • Grumman in Bethpage, New York built the wings of the Space Shuttle orbiter.6
  • Intrepid Museum 1 shared fact
    • Robert Lambert, a planner at Grumman, suggested the name Intrepid as evocative of the nation's resolute determination for continued exploration of space.15

Also named with Grumman: Bernard Etkin, LM-13.

Grumman: facts

11 facts in 4 categories · rated most surprising

Making and creation (5 facts)

  • Grumman built a plywood mockup of the lunar module at Launch Complex 37 to aid in facilities verification.3
  • Grumman made the Apollo Lunar Module.4
  • Engineers at Grumman, manufacturer of the lunar module, assigned a team of University of Toronto engineers led by senior scientist Bernard Etkin to solve how much air pressure to leave in the docking tunnel to push the modules apart.2
  • In late 1962, Grumman and Northrop began designing pressurized-cabin lunar vehicles with electric motors for each wheel.5
  • Grumman in Bethpage, New York built the wings of the Space Shuttle orbiter.6

Events (3 facts)

  • Grumman was awarded the Lunar Module contract officially on November 7, 1962.1
  • Grumman Aircraft Engineering Corporation, the lead Lunar Module contractor, predicted the first man-rated Lunar Module for the D mission would not be ready until at least February 1969, delaying the entire sequence.7
  • NASA announced the selection of Grumman as the Lunar Excursion Module contractor in November 1962.8

By the numbers (1 fact)

  • The joke invoice's final total after discounts was $312,421.24.2

Trivia (2 facts)

  • After the war, Grumman made the first aluminum canoes using left-over materials no longer needed for aircraft.4
  • Grumman issued a joking invoice to North American Rockwell for 'towing' the CSM most of the way to the Moon and back.2

Mentioned on other pages

22 facts about other subjects name Grumman

  • Intrepid Museum: Robert Lambert, a planner at Grumman, suggested the name Intrepid as evocative of the nation's resolute determination for continued exploration of space.15
  • Apollo 9: The Apollo 9 lunar module was originally going to be LM-2, but the crew found numerous flaws in it, many tied to it being the first flight-ready lunar module off Grumman's production line.11
  • NASA: NASA announced on November 7, 1962 that it had awarded the lunar module contract to Grumman in Bethpage, New York.3
  • LM-13: Apollo 19's lunar module, LM-13, which was originally assigned to Apollo 18, was only partially completed by Grumman and was used as a prop in the 1998 HBO miniseries From the Earth to the Moon.7
  • Rockwell International: North American declined payment of the joke invoice, noting it had ferried three previous Grumman LMs to the Moon without compensation.2
  • Apollo Applications Program: NASA and the main contractors Boeing, Grumman, North American Aviation and Rockwell hoped to put off the inevitable scaling down of staff and facilities after the first Moon landing.13
  • NASA: NASA asked Grumman to deliver LM-1 to Kennedy Space Center by September 1966, anticipating six months for checkout and testing.3
  • George Low: George Low decided that the next LM flight would be crewed, although Grumman wanted a second uncrewed test.8
  • Apollo command and service module: Block II would be the lunar-capable version, including a docking hatch, and the detailed design of its docking capability depended on the design of the LEM, which was contracted to Grumman Aircraft Engineering.12
  • Lunar module: During testing, the Lunar Module's rendezvous radar assembly was found to have received too much voltage during earlier tests and was replaced by its manufacturer, Grumman.14
  • Leroy Grumman: Leroy R. Grumman established the Grumman Aircraft Engineering Corporation in December 1929 on Long Island, New York.4
  • Apollo Lunar Module: The contract for design and construction of the Apollo Lunar Module was awarded to Grumman Aircraft Engineering Corporation.8
  • Apollo 5: Apollo 5 was long delayed, partly because of setbacks in developing the Apollo Lunar Module, which was manufactured by Grumman Aircraft.3
  • George Low: On May 12, 1967, George M. Low informed NASA headquarters that Grumman was committed to a June 28 delivery of LM-1, though Low noted the goal would be hard to meet.3
  • Apollo 10: The Apollo 10 astronauts tested the Lunar Module at Grumman in Bethpage, New York.10
  • Apollo Lunar Module: The Apollo Lunar Module was designed and manufactured by the Grumman Aircraft Company.16
  • Northrop Grumman: Northrop Grumman was formed in 1994 through the merger of Northrop Corporation and Grumman Aerospace.4
  • Northrop Corporation: Northrop acquired Grumman Aerospace after the end of the Cold War.4
  • Apollo Lunar Module: The Apollo Lunar Module's development was overseen by Grumman.1
  • Apollo Lunar Module: The Apollo Lunar Module was assembled in a Grumman factory in Bethpage, New York.1
  • Apollo Lunar Module: The Apollo Lunar Module was chiefly designed by Grumman aerospace engineer Thomas J. Kelly.1
  • Skylab: On April 1, 1966, MSC sent contracts to Douglas, Grumman, and McDonnell for converting a spent S-IVB stage under the name Saturn S-IVB spent-stage experiment support module.9

Sources

16 pages the facts on this page were read from

  1. Apollo Lunar Module en.wikipedia.org
  2. Apollo 13 en.wikipedia.org
  3. Apollo 5 en.wikipedia.org
  4. Northrop Grumman en.wikipedia.org
  5. Lunar Roving Vehicle en.wikipedia.org
  6. Space Shuttle orbiter en.wikipedia.org
  7. Canceled Apollo missions en.wikipedia.org
  8. Apollo program en.wikipedia.org
  9. Skylab en.wikipedia.org
  10. Apollo 10 en.wikipedia.org
  11. Apollo 9 en.wikipedia.org
  12. Apollo command and service module en.wikipedia.org
  13. Apollo Applications Program en.wikipedia.org
  14. Apollo 17 en.wikipedia.org
  15. Apollo 12 en.wikipedia.org
  16. Apollo (spacecraft) en.wikipedia.org

Facts are short sentences the Trivia Zone knowledge graph read from these pages; Wikipedia text is available under CC BY-SA 4.0 and Wikidata under CC0. Names, classes and links come from Wikidata.