Advanced Solid Rocket Motor
The Advanced Solid Rocket Motor program was cancelled in 1993 after about 2 billion dollars had been spent.1 The Advanced Solid Rocket Motor facility was planned on the location of a cancelled Tennessee Valley Authority nuclear power plant at Yellow Creek, Mississippi.1 The Advanced Solid Rocket Motor was planned to add about 12,000 lb of shuttle payload so it could carry modules and construction components to the ISS.1
A summary made of Advanced Solid Rocket Motor's own facts, quoted as read; each sentence cites its source.
Connections
0 linked subjects · 5 named together
A link reads subject → relation → subject. Each is stated by a fact (quoted, with its source), taken from Wikidata, or worked out by the knowledge graph's reasoner from the links it was given; inferred links are marked ∴ with the rule behind them.
- stated
- inferred
- named together
Named together
Subjects that share a fact with Advanced Solid Rocket Motor, with no typed link between them yet.
- NASA 1 shared fact
- NASA planned in 1988 to 1989 to replace the post-Challenger Solid Rocket Boosters with an Advanced Solid Rocket Motor built by Aerojet.1
- Tennessee Valley Authority 1 shared fact
- The Advanced Solid Rocket Motor facility was planned on the location of a cancelled Tennessee Valley Authority nuclear power plant at Yellow Creek, Mississippi.1
- Aerojet 1 shared fact
- NASA planned in 1988 to 1989 to replace the post-Challenger Solid Rocket Boosters with an Advanced Solid Rocket Motor built by Aerojet.1
- Yellow Creek Nuclear Plant 1 shared fact
- The Advanced Solid Rocket Motor facility was planned on the location of a cancelled Tennessee Valley Authority nuclear power plant at Yellow Creek, Mississippi.1
- ISS 1 shared fact
- The Advanced Solid Rocket Motor was planned to add about 12,000 lb of shuttle payload so it could carry modules and construction components to the ISS.1
Advanced Solid Rocket Motor: facts
6 facts in 5 categories · rated most surprising
Making and creation (1 fact)
- NASA planned in 1988 to 1989 to replace the post-Challenger Solid Rocket Boosters with an Advanced Solid Rocket Motor built by Aerojet.1
Events (1 fact)
- The Advanced Solid Rocket Motor program was cancelled in 1993 after about 2 billion dollars had been spent.1
Places (1 fact)
- The Advanced Solid Rocket Motor facility was planned on the location of a cancelled Tennessee Valley Authority nuclear power plant at Yellow Creek, Mississippi.1
By the numbers (1 fact)
- The initial contract for the Advanced Solid Rocket Motor was $1.2 billion for 12 motors, with an option for another 88.1
Sources
1 page the facts on this page were read from
- Space Shuttle Solid Rocket Booster en.wikipedia.org
Facts are short sentences the Trivia Zone knowledge graph read from these pages; Wikipedia text is available under CC BY-SA 4.0 and Wikidata under CC0. Names, classes and links come from Wikidata.