Nissan Smyrna Assembly Plant
Automotive assembly plant in Smyrna, Tennessee, United States
The Nissan Smyrna Assembly Plant was announced on October 31, 1980, for the production of Datsun pickup trucks.1 The Nissan Smyrna Assembly Plant was initially expected to cost $300 million but its final cost was $660 million.1 The Smyrna assembly plant later expanded to produce the Nissan Leaf all-electric car.2
A summary made of Nissan Smyrna Assembly Plant's own facts, quoted as read; each sentence cites its source.
Connections
2 linked subjects · 3 links inferred · 18 named together
A link reads subject → relation → subject. Each is stated by a fact (quoted, with its source), taken from Wikidata, or worked out by the knowledge graph's reasoner from the links it was given; inferred links are marked ∴ with the rule behind them.
- stated
- inferred
- named together
- United States Place
- (Nissan Smyrna Assembly Plant → country → United States) from Wikidata
- (Nissan Smyrna Assembly Plant → city → United States) inferred: implied by “country” (from Wikidata)
- (Nissan Smyrna Assembly Plant → location → United States) inferred: implied by “country” (from Wikidata)
- Nissan Organization
- (Nissan Smyrna Assembly Plant → owned by → Nissan) from Wikidata
- (Nissan → owner of → Nissan Smyrna Assembly Plant) inferred: the other reading of “owned by” (from Wikidata)
Named together
Subjects that share a fact with Nissan Smyrna Assembly Plant, with no typed link between them yet.
- Nissan Leaf 2 shared facts
- The Smyrna assembly plant later expanded to produce the Nissan Leaf all-electric car.2
- Datsun truck 2 shared facts
- Nissan's initial assembly plant, the Smyrna assembly plant, broke ground in 1980 and at first only built trucks such as the Datsun 720.2
- Electric car 1 shared fact
- The Smyrna assembly plant later expanded to produce the Nissan Leaf all-electric car.2
- Electric vehicle 1 shared fact
- Work began on a battery manufacturing plant onsite at the Nissan Smyrna Assembly Plant on May 26, 2010, for electric vehicles, primarily the Nissan Leaf.1
- Nissan Maxima 1 shared fact
- The Nissan Maxima was built at the Nissan Smyrna Assembly Plant from 2003 to 2023.1
- Nissan Pathfinder 1 shared fact
- The Nissan Pathfinder has been built at the Nissan Smyrna Assembly Plant since 2005.1
- Nissan Altima 1 shared fact
- The Nissan Altima was built at the Nissan Smyrna Assembly Plant from 1993 to 2020.1
- Nissan Navara 1 shared fact
- The Nissan Pickup was built at the Nissan Smyrna Assembly Plant from 1983 to 1997.1
- Nissan Murano 1 shared fact
- Since 2020, Murano production in North America has taken place at the Nissan Smyrna Assembly Plant in Tennessee rather than Canton, Mississippi.4
- Nissan Rogue 1 shared fact
- As of 2023, the Nissan Rogue was manufactured at the Nissan Smyrna Assembly Plant in Tennessee, United States.5
- Nissan Quest 1 shared fact
- Under the joint venture, Nissan contributed the powertrain and major body stampings through its Nissan Smyrna (NMMC), shipping the components to Ford for final assembly at Ohio Assembly.6
- Nissan Xterra 1 shared fact
- First generation Nissan Xterras were manufactured at Nissan's Decherd, Tennessee Plant for engines and at the Smyrna Assembly plant for final assembly.7
- Nissan USA 1 shared fact
- Nissan North America, Inc. operates a U.S. manufacturing plant in Smyrna.3
- Datsun 720 1 shared fact
- The Datsun 720 was assembled in the newly built Smyrna, Tennessee, plant from the 1983.5 model year until 1986.8
- Georgia 1 shared fact
- Nissan considered two locations in Georgia for the plant but chose the Tennessee site.1
- Smyrna, Tennessee 1 shared fact
- The Nissan Smyrna Assembly Plant in Smyrna, Tennessee began production in 1983.1
Also named with Nissan Smyrna Assembly Plant: Tennessee Department of Transportation, GSR Capital.
Nissan Smyrna Assembly Plant: facts
15 facts in 4 categories · rated most surprising
Events (10 facts)
- Nissan decided in July 2017 to sell its battery plant to GSR Capital, but the sale was canceled in July 2018 after three delays.1
- The Nissan Smyrna Assembly Plant was announced on October 31, 1980, for the production of Datsun pickup trucks.1
- Nissan considered two locations in Georgia for the plant but chose the Tennessee site.1
- The first vehicle was produced at the Nissan Smyrna Assembly Plant on June 16, 1983.1
- Work began on a battery manufacturing plant onsite at the Nissan Smyrna Assembly Plant on May 26, 2010, for electric vehicles, primarily the Nissan Leaf.1
- The Nissan Smyrna Assembly Plant in Smyrna, Tennessee began production in 1983.1
- Nissan chose the Tennessee site for its central location within the U.S. automotive market and lower-cost part transport.1
- Construction on the Nissan Smyrna Assembly Plant began on February 3, 1981.1
Places (2 facts)
By the numbers (2 facts)
Details and parts (1 fact)
- The Smyrna assembly plant later expanded to produce the Nissan Leaf all-electric car.2
Mentioned on other pages
11 facts about other subjects name Nissan Smyrna Assembly Plant
- Nissan Murano: Since 2020, Murano production in North America has taken place at the Nissan Smyrna Assembly Plant in Tennessee rather than Canton, Mississippi.4
- Datsun 720: The Datsun 720 was assembled in the newly built Smyrna, Tennessee, plant from the 1983.5 model year until 1986.8
- Nissan Quest: Under the joint venture, Nissan contributed the powertrain and major body stampings through its Nissan Smyrna (NMMC), shipping the components to Ford for final assembly at Ohio Assembly.6
- Tennessee Department of Transportation: The Tennessee Department of Transportation built Nissan Drive, a four-lane highway connecting the Nissan Smyrna Assembly Plant to Interstate 24.1
- GSR Capital: The sale of the battery plant to GSR Capital was canceled in July 2018 because GSR Capital did not pay on time.1
- Nissan Xterra: First generation Nissan Xterras were manufactured at Nissan's Decherd, Tennessee Plant for engines and at the Smyrna Assembly plant for final assembly.7
- Nissan Rogue: As of 2023, the Nissan Rogue was manufactured at the Nissan Smyrna Assembly Plant in Tennessee, United States.5
- Nissan Pathfinder: The Nissan Pathfinder has been built at the Nissan Smyrna Assembly Plant since 2005.1
- Nissan Maxima: The Nissan Maxima was built at the Nissan Smyrna Assembly Plant from 2003 to 2023.1
- Nissan Altima: The Nissan Altima was built at the Nissan Smyrna Assembly Plant from 1993 to 2020.1
- Nissan Navara: The Nissan Pickup was built at the Nissan Smyrna Assembly Plant from 1983 to 1997.1
Sources
8 pages the facts on this page were read from
- Nissan Smyrna Assembly Plant en.wikipedia.org
- Nissan en.wikipedia.org
- Nissan USA en.wikipedia.org
- Nissan Murano en.wikipedia.org
- Nissan Rogue en.wikipedia.org
- Nissan Quest en.wikipedia.org
- Nissan Xterra en.wikipedia.org
- Datsun truck en.wikipedia.org
Facts are short sentences the Trivia Zone knowledge graph read from these pages; Wikipedia text is available under CC BY-SA 4.0 and Wikidata under CC0. Names, classes and links come from Wikidata.